Citation: Otto Andersen, Geoffrey Gilpin, Anders S.G. Andrae. Cradle-to-gate life cycle assessment of the dry etching step in the manufacturing of photovoltaic cells[J]. AIMS Energy, 2014, 2(4): 410-423. doi: 10.3934/energy.2014.4.410
[1] | Edwin Collado, Easton Li Xu, Hang Li, Shuguang Cui . Profit maximization with customer satisfaction control for electric vehicle charging in smart grids. AIMS Energy, 2017, 5(3): 529-556. doi: 10.3934/energy.2017.3.529 |
[2] | Dalong Guo, Chi Zhou . Potential performance analysis and future trend prediction of electric vehicle with V2G/V2H/V2B capability. AIMS Energy, 2016, 4(2): 331-346. doi: 10.3934/energy.2016.2.331 |
[3] | Nikolaos S. Korakianitis, Nikolaou Nikolaos, Georgios A. Vokas, George Ch. Ioannidis, Stavros D. Kaminaris . Simulation-Based evaluation of dynamic wireless charging systems for electric vehicles: Efficiency, limitations, and future directions. AIMS Energy, 2025, 13(3): 590-631. doi: 10.3934/energy.2025023 |
[4] | Mansoor Soomro, Zeeshan Ali Shaikh, Mazhar Baloch, Abdul Manan Shaikh, Sohaib Tahir Chauhdary . Development of wind and solar systems for power charging: An application of an electric vehicle to grid systems. AIMS Energy, 2024, 12(3): 664-685. doi: 10.3934/energy.2024031 |
[5] | Ryuto Shigenobu, Oludamilare Bode Adewuyi, Atsushi Yona, Tomonobu Senjyu . Demand response strategy management with active and reactive power incentive in the smart grid: a two-level optimization approach. AIMS Energy, 2017, 5(3): 482-505. doi: 10.3934/energy.2017.3.482 |
[6] | Akash Talwariya, Pushpendra Singh, Mohan Lal Kolhe, Jalpa H. Jobanputra . Fuzzy logic controller and game theory based distributed energy resources allocation. AIMS Energy, 2020, 8(3): 474-492. doi: 10.3934/energy.2020.3.474 |
[7] | Anbazhagan Geetha, S. Usha, J. Santhakumar, Surender Reddy Salkuti . Forecasting of energy consumption rate and battery stress under real-world traffic conditions using ANN model with different learning algorithms. AIMS Energy, 2025, 13(1): 125-146. doi: 10.3934/energy.2025005 |
[8] | Rasool M. Imran, Kadhim Hamzah Chalok . Innovative mode selective control and parameterization for charging Li-ion batteries in a PV system. AIMS Energy, 2024, 12(4): 822-839. doi: 10.3934/energy.2024039 |
[9] | Albert Albers, Aline Radimersky, Sascha Ott . Systematic definition of objectives for battery systems considering the interdependencies in electric vehicles. AIMS Energy, 2016, 4(5): 723-741. doi: 10.3934/energy.2016.5.723 |
[10] | Sulabh Sachan . Integration of electric vehicles with optimum sized storage for grid connected photo-voltaic system. AIMS Energy, 2017, 5(6): 997-1012. doi: 10.3934/energy.2017.6.997 |
Following the increasing ownership of private plug-in hybrid electric vehicles (PHEVs), in-home charging is expected to become one of the common activities of electricity customers in the near future. Since most PHEV owners are used to charge their PHEVs as soon as they arrive home, the peak load associated with charging often appears around the rush hours. In the meantime, the residential load increases due to cooking and other in-home entertainment activities. As a result, the intrinsic peak load situation is aggravated [1].
In order to shift the peak load of a power system, there are two main approaches. One is to schedule the electricity demand by signing a contract between utility company and customers [2]. This approach can be easily implemented, however, its flexibility and options are limited to be popularized in the future. Another approach is based on smart pricing. Since the base load and charging demand are time-varying over a day, the distribution service provider (DSP) can adjust the electricity rate in different periods such that PHEV owners are willing to shift their charging time to off-peak hours for a lower price. Various pricing strategy can be applied, such as critical-peak pricing, real-time pricing, and time-of-use (TOU) pricing [3].
A vital part of smart pricing is to estimate the corresponding charging strategy of PHEV owners. The game-theoretic approach is ideal to address this issue as it can reveal the relationship between the pricing strategy of DSP and the charging strategy of PHEV owners. At the Nash equilibrium, all players in the game have no tendency to alter their decisions. In this way, the DSP can analyze the group performance of all PHEV owners. In literature, game models are proposed to coordinate the charging demand of PHEVs and the revenue of the DSP while keeping the stability of the power grid. In [4], a game theoretic approach is proposed to optimize the schedule of electric vehicle charging in a parking lot with a highly dynamic electricity price during the day time. Beaude et al. propose a static non-cooperative game formulation of distributed charging in electric vehicle networks, where several electric vehicles are connected to a common residential distribution transformer and each player aims at choosing an optimal starting time of charging [5]. A hierarchical game approach is applied in [6] with a real-time charging price in the fast charging station. For the in-home charging, Yoon et al. propose a Stackelberg game based on demand response [7]. The relevance between the weight factor of each PHEV owner and the optimal price is analyzed, which indicates that the Nash equilibrium can differ when considering the individual differences among followers in the game model. In [8], the authors propose a firm-union bargaining game approach for PHEV charging access control, to determine the starting time of PHEV charging. A central governing procedure to realize the demand-side management in the game model is developed in [9], which is able to schedule load flexibly over multiple time periods. A stochastic optimization model for optimal bidding strategies of electric ve- hicle (EV) aggregators is studied in [10] and [11] considering EV fleet characteristics, hourly loads and influence of wind-driven generators. In a similar case, a decentralized control method is applied in [12] to coordinate the charging load and the renewable sources. The price competition among EV charging stations is studied in [13]. In [14], the interaction among charging stations is modelled by considering transportation conditions. In [15], the randomness of EV’s availability is considered in a day-ahead energy market to shape a general profile of the charging demand in distribution system. A new approach to maintain the system stability through game model is developed in [16], where both aggregators and EVs consider of the quality of energy requirements. More detailed analysis about quality of energy requirements can be developed by modifying the utility function in the game formu- lation, which involves the impact of line loss and voltage regulation on PHEV charging scheduling. Some recent research works in power engineering propose linear approximation algorithms for power flow analysis [17,18,19], which may provide some effective and efficient means to assess the impact of power flows in distribution systems. Yet, how to incorporate power flow analysis into the game model of PHEV charging control is still an open issue.
In this paper, we construct a leader-follower game model for PHEV charging control based on the Stackelberg game framework. Each PHEV owner plays the role of follower, who chooses the start time of charging based on the pricing schedule provided by the DSP. When the PHEV owners arrive home, they continue to make decisions between starting PHEV charging and waiting, until midnight when they have to sleep. Once they start charging the PHEVs, their costs are fixed which are not influenced by the alteration of the charging price. For the DSP, he/she can optimize the pricing schedule according to the arrival probability of PHEVs and the base load of residents. The general utility of the DSP is related to the energy cost and the payoff from PHEV owners. In order to characterize the impact of power flows in distribution systems, both line loss and voltage regulation are included in the cost of the DSP in our proposed game model. Specifically, the line loss and voltage regulation can be obtained via traditional power flow analysis, which is nonlinear in nature. As a result, the Nash equilibrium of the game model is obtained through multivariate nonlinear programming with a high computational complexity. To facilitate practical applications, a linear approximation of power flow equations is applied in this paper. For the distribution system under consideration, the methods proposed in [20] and [21] are utilized to analyze line loss and voltage regulation, respectively, based on which the solution of the sub-game perfect Nash Equilibrium is derived. Extensive simulations based on the IEEE 13-bus test feeder and realistic PHEV charging statistics are performed to demonstrate the effectiveness of the proposed PHEV charging control scheme.
The rest of this paper is organized as follows. The system model is introduced in Section 2. The PHEV charging control problem is formulated as a non-cooperative dynamic game in Section 3. The solution of the sub-game perfect Nash Equilibrium is presented in Section 4. In Section 5, a case study is provided to verify our theoretical analysis. The concluding remarks are drawn in Section 6 with future work.
In the electricity market, the retailers can adjust the customers’ electricity demand through various pricing schedules [23]. Stability and stochastic analysis of the responding demand can be performed to help reduce the cost of the DSP while protecting the power grid [24]. On the other hand, in energy transactions, the electricity customers are often price-driven [25]. So in our market model, the DSP earns revenue from the fee of charging service, while its cost includes the cost of generation, line loss and voltage regulation. O n the other hand, the PHEV owners can benefit from the low electricity price at certain time by adjusting its starting time of charging according to the pricing schedule.
Consider a distribution feeder with N buses. When there are kn PHEVs charging in the residential houses on bus n, the total electric power consumption of PHEV charging is given by
Pc=N∑n=1knPper | (1) |
where Pper is the charging power of each PHEV. With a considerable penetration of PHEVs, the line loss on the feeder cannot be ignored. In other words, to distribute a certain amount of load, the DSP has to supply a larger amount of electric power due to the line loss. For the PHEV owners, it is difficulty to estimate the influence of line loss on their charging price. However, for the DSP, the line loss is directly included in the total cost of electricity delivery. In other words, only the DSP investigates the cost associated with the line loss. To maximize the revenue, the DSP can adjust the electricity price according to the line cost. Since the PHEV owners make charging decisions according to the electricity price, they are indirectly influenced by the cost associated with line loss. Through power flow analysis, the line loss caused by PHEV charging can be obtained by the base load and charging load on each bus as well as the admittance matrix of the distribution system. Furthermore, when there is a large number of PHEVs charging at the same time, the voltage drop on some terminal nodes can be severe, which may result in an inferior power quality in the distribution system. Therefore, the DSP needs to take operations on the voltage regulator once it is necessary to increase the voltages of terminal nodes. However, there is a cost associated with the voltage regulation. Here we apply an approach of reactive power compensation as voltage regulation [21], where the cost of voltage regulation can be converted into power compensation. Thus, the actual power consumption of PHEV charging can be calculated as
E=Pc+Pl+Qr | (2) |
where Pc is the total charging load, Pl is the extra line loss caused by PHEV charging in comparison with the case without PHEV charging, and Qr is the reactive power compensation for voltage regulation determined by base load and charging load of the distribution system. Note that both Pl and Qr are nonlinear functions which can be obtained through power flow analysis. Based on (2), the total cost of the DSP is given by
C=aE | (3) |
where a > 0 is the cost coefficient. Note that in practice, the relationship between electric power consumption and cost can be more complicated if we also consider other factors in power distribution, such as operation, maintenance, billing/collection/administration, depreciation, and interest [22]. Yet, an extension to more detailed cost models for the DSP (e.g., quadratic model and translog model [22]) is left for our future work.
In terms of the charging process, we consider a dynamic process over a whole night, which consists of a sequence {1, 2,..., T} of time slots. The duration of each time slot is Δt, during which the charging process can be regarded as a static process. In time slot ti, the DSP publishes a TOU price pi. Each PHEV owner makes a decision on starting PHEV charging or wai ting, based on the TOU price and prior knowledge of historical prices as well as general electricity usage. Besides, the decision makers in time slot ti can be categorized into two types: one is the newly arriving PHEV owners, the number of whom is constant on each bus in time slot ti; the other consists of PHEV owners that have made the decisions of waiting before, the number of whom is determined by the strategies of PHEV owners. Mathematically, the relationship between the two parties is given by
Mni=Mni,arrival+Mni−1,wait=Mni,charge+Mni,wait | (4) |
where Mni is the number of decision makers in time slot ti on bus n, while Mni,arrival, Mni,wait and Mni,charge are the numbers of newly arriving, waiting and charging PHEVs, respectively. Besides, given the charging duration d of PHEVs, we can express the total number of charging PHEVs on bus n in time slot ti (kn,i, which corresponds to kn in (1)) as follows:
kn,i=i∑t=i−d+1Mnt,charge. | (5) |
Furthermore, the PHEV owners need to concern about the delay discomfort as the cost of waiting. In other words, a long waiting time can only be offset by a considerable revenue of charging. Otherwise, the PHEV owners will continue to wait. In case that they do not charge over night, the owners can refuel PHEVs with gas for their daily commute demand.
The base load is another significant factor for the DSP. Even if there is no PHEV charging, the base load of daily electricity usage of residents may lead to peak load and voltage instability. The load of PHEV charging will aggravate the peak load. Taking the PHEV charging into consideration, the per-slot load in (2) can be expressed as
Ei=Pc,i+Pl,i+Qr,i | (6) |
where Ei, Pc,i, Pl,i, and Qr,i are the actual total load, charging load, line loss, and reactive power compensation for voltage regulation in time slot ti, respectively. Thus, we can express the cost function of the DSP in (3) over all time slots as
C=T∑i=1Ci=aT∑i=1Ei. |
Generally speaking, the pricing process between the retailer and customers can be modelled by a leader-follower game, where the leader is the retailer and the follower is the group of all customers. Accordingly, the revenue of the follower is the welfare of all potential customers. In other words, each customer always makes a decision to maximize the group interest instead of an individual one, which is not a proper way to estimate the individual charging behaviour. Therefore, we apply a new model with an individual revenue function in order to obtain the total electric power consumption closer to the reality. We also take some factors of power flow into consideration. In this way, the individual characteristic of charging behaviour is distinguished by detailed factors like location, starting time, and individual revenue of charging.
The charging process can be divided into two steps. At first, the DSP publishes the TOU price in advance. Then, the PHEV owners determine when to start charging. The available information of PHEV owners for decision-making includes the degree of patience to wait, speculative price limit and real-time price; In order to determine a proper pricing schedule, the DSP should have the knowledge about the number of arriving PHEVs in each time slot on each bus of distribution system, the average charging duration, the charging strategies of PHEV owners and the cost of power distribution including the cost of generation, line loss and voltage regulation. Therefore, the charging process can be modelled as a game with incomplete information, since the pricing strategy and utility of the DSP are unknown to the PHEV owners, while the decision criterions of the PHEV owners are unknown to the DSP. To determine the pricing schedule, the DSP needs to analyze the charging strategies of PHEV owners and estimate the total additional electric power consumption due to the charging process. The best pricing strategy for the DSP is to minimize the cost with a maximized revenue. The strategic form of the game is defined by Γ={Mi∪D,{xn,k},{Un,k},p,R(p)}, the components of which are listed as follows:
· Mi is the set of PHEV owners who play the role of decision makers in time slot ti on each bus according to the price maker D;
· xn, k is the strategy of PHEV owner k on bus n, where xn, k = C denots starting PHEV charging and xn, k = W represents waiting;
· Un, k is the utility function of PHEV owner k on bus n, which is characterized by the speculative price limit, historical price, and real time price;
· p = {p1, p2,..., pT} is the vector of TOU pricing schedule provided by the DSP;
· R(p) is the utility function of the DSP, which depends on the price vector p.
We denote the PHEV owner in each residential house as k ∈ {1, 2,..., K}. The utility function of PHEV owner k is denoted by Uk (xk, p, plim, w, i), where xk ∈ {C, W} is the decision of starting PHEV charging or waiting, p is the vector of the real-time price, plim is the speculative price limit, and time slot ti is the decision time of the PHEV owner. To model of the charging behaviour in response to the real-time price, two assumptions are made as follows.
1. The speculative price limit increases with the increasing waiting time according a discounting process plim(t) = wt plim(0) ;
2. The speculative price limit is subject to an exponential distribution.
Here, w ∈ (0, 1) is the delay discomfort coefficient of the PHEV owner. The physical meaning is that the speculative price limit reduces by a factor of w after waiting for each time slot with duration Δt. The details of the two assumptions are discussed in Subsections 3.2.2 and 3.4, respectively.
According to the consumer choice behaviour model in [26], the individual speculative price limit plim can be expressed by the real-time price pi adding a deviation ε. Here ε is a random variable influenced by unobservable characteristics. Due to different past purchasing experience, purchase demand and waiting time, the value of plim varies. And the real-time price is also time-varying. As a result, ε, the deviation of speculative price limit and real-time price can indicate the price gap between expectation and reality. If the speculative price limit is greater than or equal to the real-time price, the PHEV owner tends to start charging. Otherwise, a decision of waiting is likely to be made by the PHEV owner. Mathematically, we have
Uk(C,p,plim,w,i)=plim−pi | (7) |
where pi is the price in time slot ti, obtained from vector p.
In the decision making process of PHEV owner, the utility of waiting in time slot ti can be expressed with the expected utility of charging later. However, due to the inconvenience of waiting, the specu- lative price limit after waiting is lower. According to [27], the satisfaction rating usually decreases along with time, and the tendency of decreasing gradually slows down. Therefore, in our model, we approximate the speculative price limit after waiting for t time slots as ωtplim. Accordingly, the utility of waiting for one time slot is given by
Uk(C,p,plim,w,i+1)=wplim−pi+1. | (8) |
Similarly, the utility of charging in t time slots later is given by
Uk(C,p,plim,w,i+t)=wtplim−pi+t. | (9) |
Based on (9), the utility of waiting can be expressed by
Uk(W,p,plim,w,i)=1T−iT∑t=i+1Uk(C,p,plim,w,t)=1T−i(Wiplim−T∑t=i+1pt) | (10) |
where Wi is a constant determined by the discount factor w, given by
Wi=wT−i−1w−1. | (11) |
From (7) and (10), the utility function of PHEV owners can be obtained.
In general, the utility of DSP depends on the revenue from charging and the relative cost. The latest models in [28,29,30] define the utility of DSP as the revenue minus the cost. In these models, the revenue can be calculated based on electricity consumption multiplied by the price. The cost needs to be estimated and can involve factors such as generation cost, line loss, as well as voltage regulation. Since a time-varying system is considered in this paper, these factors are also time-varying. Mathematically, the utility of DSP in each time slot can be expressed by the revenue minus the cost given by
Ui=piPc,i−aEi=(pi−a)Pc,i−aPl,i−aQr,i. | (12) |
Thus, the optimal pricing strategy p* of the DSP can be obtained by solving the following nonlinear programming problem:
maxpT∑i=1Ui | (13) |
s.t.pi∈(plim,∞). | (14) |
In (13), it is obvious that the utility of the DSP depends on not only the pricing strategy and the cost of electricity consumption, but also the demand response in terms of PHEV charging scheduling as well as the cost on the power grid. Furthermore, the utility function of the DSP is a time varying function, which means that directly increasing the charging price in the peak hour is not a proper solution. The reason is that, on one hand, the charging load before the peak hour will be maintained. As a result, it will be too late to reduce the charging load on the peak hour. On the other hand, in essence, the control of the charging load is to redistribute the number of charging PHEVs in each time slot. Due to the continuity of time, to make the off-peak price cheap is another proper strategy to incentivize the PHEV owners’ tendency of off-peak charging. In this way, the DSP can realize the goal of peak load shifting with revenue maximization.
In time slot i, given the TOU price vector p, whether to charge the PHEV is determined by the speculative price limit plim. Based on (7) and (10), the condition of charging is given by
Uk(xk=C)>Uk(xk=W). | (15) |
Equivalently, we have
plim−pi>1T−i(Wiplim−T∑t=i+1pt). | (16) |
Then, the value of plim is given by
plim>(T−i)pi−T∑t=i+1ptT−i−Wi. | (17) |
Given the discount factor w, the right hand side of (17) is a function of the TOU price vector. Here, we define a variable B(i) as
B(i)Δ=(T−i)pi−T∑t=i+1ptT−i−Wi. | (18) |
Then, we can regard B(i) as a threshold function of the speculative price limit, so that the only determinant factor is plim. In other words, when plim is larger than B(i), it is more beneficial for the owner to start PHEV charging right away. Otherwise, waiting will be a proper choice. In this way, we can estimate an individual decision by a unified function, which indicates the group performance of PHEV owners. Based on the statistics obtained by investigating historical data, the distribution of speculative price limit can be obtained. In general, the number of customers under certain speculative price limit decreases with the increase of the value of the speculative price limit. According to [31], exponentially distributed reservation prices are widely used. Here, the reservation price means an expected acceptable price for customers, which is similar to the definition of speculative price limit in our model. However, conventional exponential distribution starts from zero, while the electricity price can hardly be zero due to the cost associated with the power flow analysis. So we set an additional lower bound (pmin) for the speculative price limit. Accordingly, the speculative price limit can be modelled as plim-pmin ~ exp(λ), where λ is a constant obtained from historical data. In this way, we can estimate the expected number of charging PHEVs, given by
ˉMni,charge=Mni∫∞B(i)−pminλe−λxdx=Mnie−λ[B(i)−pmin]. | (19) |
Based on the expected number of charging PHEVs, the expected charging power can be calculated based on (1) and (5).
Consider every bus on th e feeder as a PQ bus. For the DSP, the average load in time slot i on each bus, i.e., ˉsi,1,ˉsi,2,…,ˉsi,N, are available. Adding the electric power consumption of PHEV charging, the actual load on each bus is given by
ˆsi,n=ˉsi,n+Pperi∑t=i−d+1ˉMnt,charge | (20) |
where d is the average charging duration of each PHEV. Generally speaking, for a distribution feeder, the line loss can be calculated by the voltage drop and the impedance between each two connected buses, given by
Pl=N∑i=1N∑j=1(vi−vj)2|Zi,j| | (21) |
where vi is the voltage on bus i, and Zi, j is the impedance between bus i and j. There are many approaches of power flow analysis to calculate the voltage on each bus with the load data. Here we apply an approach of linear approximation [20] to simplify the computation. Mathematically, we have
vi=V0ejθ0(1+ZˆsiV20) | (22) |
where vi is the voltage vector, V0ejθ0 is the voltage on the slack bus, Z is the impedance matrix, and ˆsi is the total load vector. Based on (20), (21), and (22), we can calculate the total line loss as a linear function of th e load. Specifically, the line loss resulted from PHEV charging can be calculated as
Pl,i=Pl(ˆsi)−Pl(ˉsi). | (23) |
Another electricity distribution cost is resulted from voltage regulation. There are various ap- proaches to deal with the voltage drop. In this paper, we consider that the voltage is regulated by reactive power compensation. The corresponding cost of voltage regulation depends on the compen- sated reactive power. For example, if the voltage regulator is installed on bus m, the load on bus m is ˉsm=0−jQm. Then the compensated reactive power can be obtained via nonlinear programming. The solution is the minimum value of Qm that satisfies vn>vmin,∀n, where vmin is the minimum voltage based on power quality requirement and vn can obtained from (22).
Recall from the previous section, the utility of the DSP (13) is a complex nonlinear function. As a result, the existence of the solution cannot be proved directly. Besides, the solution of the sub- game perfect Nash equilibrium (SPNE) is also hard to be obtained. Therefore, in this section, we will simplify (13) and propose a practical approach to solve the problem through iterations of linear functions.
Given the pricing vector p, a constant sequence of B(i) can be obtained according to (18). Then we can calculate the charging rate in each time slot, given by
μi,n=e−λ[B(i)−pmin]=ˉMni,chargeMni. | (24) |
Based on (4) and together with the charging rate μni and the arrival number Mni,arrival, the number of PHEVs that start charging in time slot i can be rewritten recursively, given by
ˉMni,charge={μ1,nMn1,arrivali=1μi,ni∑t=1[Mnt,arrivali−1∏j=t(1−μi,n)]i>1. | (25) |
Since given the price vector p, the values of μi,n and Mni,arrival are all available, thus the number of PHEVs that start to charge in time slot i can also be obtained as a constant sequence. According to (20), the total charging load on bus n in time slot i is given by
sc,i,n=Pperi∑t=i−d+1ˉMnt,charge. | (26) |
Up to now, we have converted the price into a sequence of uncoupled variables sc,i,n, which only depends on the pricing schedule provided by the DSP. In this way, (13) can be rewritten as a function of sc,i,n, given by
U(s)=T∑i=1[(pi−a)Pc,i(s)−aPl,i(s)−aQr,i(s)] | (27) |
where sΔ=[sc,1,1,…,sc,T,N] is the charging load vector. If SPNE exists, the solution should be either one of the stationary points or on the boundary of the domain of definition. The partial derivative function of (27) is given separately in the following. For the charging consumption Pc,i, it is easy to calculate the partial derivative function, given by
∂Pc,i∂sc,i,n=pi−a. | (28) |
According to (21), the partial derivative function of Pl,i is given by
∂Pl,i∂sc,i,n=N∑m=1N∑n=1[2(vm−vn)|Zm,n|∂(vm−vn)∂sc,i,n], | (29) |
where vn has been given in (22). Thus, we have
vi,n=V0ejθ0[1+1V20N∑m=1Zm,n(ˉsi,m+sc,i,m)]. | (30) |
The partial derivative of vi,n is given by
∂vi,n∂sc,i,n=ejθ0V0Zn,n. | (31) |
Therefore, the partial derivative function of Pl is a homogeneous linear function of the vector s.
Assume bus f experiences the most significant voltage drop on the feeder. Also, we consider a typical placement of the voltage regulator, i.e., at the beginning of the feeder (on bus 2). Then, we have ˉsi,2=0 and sc,i,2=−Qr,i. Together with (30), the compensated reactive power is given by
Qr,i=1Z2,f[N∑m=1,m≠2Zm,f(ˉsi,m+sc,i,m)−(vi,fV0ejθ0−1)V20]vi,f=vmin. | (32) |
The partial derivative function of Qr,i is a constant, given by
∂Qrsc,i,n=ΔZn,fZ2,f. | (33) |
Combining (28), (31), and (32), the condition of the stationary points is given by a set of linear equations as follows
[p1−α1⋮pT−αT×N]−a[δ1,1⋯δ1,T×N⋮⋱⋮δT×N,1⋯δT×N,T×N][sc,1,1⋮sc,T,N]=0 | (34) |
where α and δ are all constants determined by the power grid and electricity cost. In this way, given an initial value of p, the charging load vector s can be obtained through (24)-(26). Then a new value of p can be obtained from (34). Based on the iterations, the final result will converge to an optimal pricing schedule. Even though some variables may exceed the bounds, we can replace them by the boundary values and remove the corresponding equations in (26). Since both p and s are continuous on the bounded domain of definition, we can always find a solution from (26), i.e., the solution of SPNE always exists.
Our case study is based on the IEEE 13-Bus distribution test feeder. Each bus is assumed to be a service transformer in a residential area, as shown in Figure 1. Both the daily base load and PHEV charging load are delivered through the same feeder. The voltage regulator is installed close to the slack bus. Besides, the rated power and voltage on the slack bus are 4.16 MV A and 4.16 kV, respectively. The hourly base load is obtained from the data set of Electric Reliability Council of Texas (ERCOT) [32], which manages the electric power for 24 million Texas customers - representing about 90 percent of the state’s electric load. For the in-home charging station, we use the parameters of CT4000 Level 2 Commercial Charging Stations [33] in our simulations. The charging power is 7.2 kW and the charging duration is approximately 3 hours. The TOU price provided by the DSP varies every 30 minutes.
Four cases are considered in our simulations. In case 1, the PHEV owners start charging as soon as they arrive home; In case 2, the optimal TOU pricing is calculated based on our model with the speculative price limit discount factor w = 0.98 and the distribution parameter of speculative price limit λ = 1; In case 3, we reduce the value of w to 0.96 to evaluate the impact of delay discomfort as the cost of waiting; In case 4, we halve the value of λ to evaluate the impact of speculative price limit.
In the following, we will observe the influence of PHEV charging control on the load, charging rate μ, line loss, and voltage regulator consumption. Besides, to simplify the simulations, we define a per unit price with respect to the base price a, given by
ηi=pia(p.u.). | (35) |
Since a is a constant, according to (35) and ηi, we can ignore the impact of a on the results.
In Figure 2, we can find that the TOU price delays the peak load of charging effectively. The standard deviation of the load over the night has been reduced by 27.1%. In case 1, the peak load comes at around 7:00 pm and in case 2, the dominant peak load is mainly at 9:00 pm. Figure 3 shows the charging rate in each case. In case 1, the charging demand of every PHEV can be satisfied while in case 2 not. Due to the high base load and arriving home late, some of the PHEV owners will keep waiting until the midnight. If they cannot find a proper time to start charging, they can refuel their PHEVs with gas for the driving demand in the next day. Besides, it should be noticed that in our model, the peak load shifting is postponed. The off-peak load period between early arrival peak of PHEVs and the peak of base load is much shorter compared with the charging duration, such that the charge rate is always low then.
Figure 4 and Figure 5 demonstrate the line loss and voltage regulation in each case. The delivery ef- ficiency has been improved. Specifically, for the voltage regulation, the total consumption is decreased by 14.9%. And the details of the voltage range after regulation is shown in Table 1. More importantly, we can observe that th e fluctuation of the voltage regulation has been remitted. Accordingly, the num- ber of time to operate the voltage regulator is reduced, which can significantly reduce the wear and tear of voltage regulator.
Bus number | Maximum voltage / p.u. | Minimum voltage / p.u. |
3 |
0.9925+j0.0772 |
0.9962 + j0.0386 |
4 | 0.9929+j0.0810 | 0.9964 + j0.0405 |
5 | 0.9932+j0.0841 | 0.9965 + j0.0420 |
6 | 0.9935+j0.0821 | 0.9967 + j0.0410 |
7 | 0.9939+j0.0837 | 0.9969 + j0.0418 |
8 | 0.9880+j0.1316 | 0.9940 + j0.0658 |
9 | 0.9880+j0.1346 | 0.9944 + j0.0680 |
10 | 0.9914+j0.1401 | 0.9957 + j0.0700 |
11 | 0.9887+j0.1344 | 0.9944 + j0.0671 |
12 | 0.9899+j0.1360 | 0.9949 + j0.0679 |
13 | 0.9892+j0.1355 | 0.9946 + j0.0677 |
14 | 0.9881+j0.1329 | 0.9940 + j0.0664 |
For the decision factor of PHEV owners, we can find an obvious relevance to the peak load shifting result. The value of w close to 0 means the intolerance of waiting. In other words, as long as the PHEV owners are patient enough, they can always find a proper time to start charging without aggravating the peak load. Moreover, the value of λ denotes the PHEV owner’ sensitivity to the price fluctuation. The more the value of λ is close to 1, the more the TOU price can influence the charging preference.
Since the solution to our model is iterative, the traditional methods of computational complexity analysis can hardly be applied here. Therefore, we use the number of iterations to indicate the computational cost of our solution. As shown in Figure 6, the per unit price ηi converges within about 10 iterations. And in each iteration, we mainly solve the linea r equations (34). According to the result, the computational cost is acceptable.
In this paper, we propose a leader-follower game model between PHEV owners and the DSP. The utility of each PHEV owner is formulated by considering the distribution of speculative price limit. For the utility of the DSP, we take two factors of power flow analysis into consideration, i.e., line loss and voltage regulation. To obtain the solution of the optimal price, we apply an approximated linear function in power flow analysis and propose the corresponding optimal algorithm. Simulation results demonstrate that our proposed model can improve the power quality of the distribution system, in terms of lower system peak load and less voltage fluctuations. In our future work, we will take the randomness of PHEV owners into consideration, including the randomness in arrival time and tolerance of price variation, as well as the stochastic base load.
This work is supported by Alberta Innovates Technology Futures (AITF) postdoctoral fellowship and a research grant from the Natural Science and Engineering Research Council (NSERC) of Canada.
All authors declare no conflict of interest in this article.
[1] | Dominguez-Ramos A, Held M, Aldaco R, et al, (2010) Prospective CO2 emissions from energy supplying systems: Photovoltaic systems and conventional grid within Spanish frame conditions. Int J LCA 15(6): 557-566. |
[2] | Andersen O (2013) Solar Cell Production. In: Unintended Consequences of Renewable Energy. Problems to be Solved. Springer London, London, 81-89. |
[3] | Bianco C, Torrelli A, Squizzato V, et al.. Energy and carbon pay back times for renewable power supply systems for Italian RBS off-grid sites. Telecommunications Energy Conference (INTELEC), 2011 IEEE 33rd International; 2011 9-13 Oct.; Amsterdam, the Netherlands. IEEE. 1-6. |
[4] | Andrae ASG, Dong H, Shudong L, et al.. Added value of life cycle assessment to a business case analysis of a photovoltaic/wind radio base site solution in South Africa. Telecommunications Energy Conference (INTELEC), 2012 IEEE 34th International; 2012 30 Sept.-4 Oct.; Scottsdale, AZ, USA. IEEE. 1-7. |
[5] | Zehner O (2011) Unintended Consequences of Green Technologies. Green Technology. Sage, London, 427-432. |
[6] | Duffy E (2012) SOLNOWAT—Development of a competitive zero Global Warming Potential (GWP) dry process to reduce the dramatic water consumption in the ever-expanding solar cell manufacturing industry. D7.3 Exploitation Plan (interim). |
[7] | Agostinelli G, Dekkers HFW, De Wolf S, et al. (2004) Dry Etching and Texturing Processes for Crystalline Silicon Solar cells: Sustainability for Mass Production. Paris, 423-426. |
[8] | Forster P, Ramaswamy V, Artaxo P, et al. (2007) Changes in Atmospheric Constituents and in Radiative Forcing. In: Climate Change 2007: The Physical Science Basis. Contribution of Working Group I to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change. Cambridge University Press, Cambridge, United Kingdom and New York, NY, USA. |
[9] | Piechulla P, Seiffe J, Hoffman M, et al.. Increased Ion Energies for Texturing in a High-Throughput Plasma Tool. European Photovoltaic Solar Energy Conference and Exhibition (EU PVSEC); 2011 5-9 Sept.; Hamburg, Germany. Fraunhofer-Publica. 2024-2027. |
[10] | Alsema E (2000) Energy pay-back time and CO2 emissions of PV systems. Prog Photovoltaics: Res Appl 8(1): 17-25. |
[11] | Alsema E, de Wild-Scholten M. Environmental Impact of Crystalline Silicon Photovoltaic Module Production. 13th CIRP Intern. Conf. on Life Cycle Engineering; 2006 31 May-2 Jun.; Leuven, Belgium. G3.3. |
[12] | Fthenakis VM, Kim HC, Alsema E (2008) Emissions from Photovoltaic Life Cycles. Environ Sci Technol 42:2168-2174. |
[13] | Fthenakis VM, Kim HC (2010) Photovoltaics: Life-cycle analyses. Sol Energ 85:1609-1628. |
[14] | Pehnt M (2006) Dynamic life cycle assessment (LCA) of renewable energy technologies. Renew Energ 31:55-71. |
[15] | Jungbluth N (2005) Life cycle assessment of crystalline photovoltaics in the Swiss ecoinvent database. Prog Photovoltaics: Res Appl 13:429-446. |
[16] | Fthenakis VM, Kim HC (2007) Greenhouse-gas emissions from solar electric- and nuclear power: A life-cycle study. Energ Policy 35:2549-2557. |
[17] | Bergesen J D, Heath GA, Gibon T, et al. (2014) Thin-film photovoltaic power generation offers decreasing greenhouse gas emissions and increasing environmental co-benefits in the long term. Env Sci Tec 48(16): 834-9843. |
[18] | Kim, H. C., Fthenakis, V., Choi, J., & Turney, D. E. (2012). Life cycle greenhouse gas emissions of thin-film photovoltaic electricity generation: Systematic review and harmonization. J Ind Ecol 16(SUPPL.1): S110-S121. |
[19] | Fthenakis V, Kim HC, Alsema E (2008). Emissions from photovoltaic life cycles. Env Sci Tec 42(6): 2168-2174. |
[20] | European Commission (2003) External Costs. Research results on socio-environmental damages due to electricity and transport. European Commission, Directorate-General for Research Information and Communication Unit, Brussels. |
[21] | European Commission (1995) ExternE: Externalities of Energy. Prepared by ETSU and IER for DGXII: Science, Research & Development, Study EUR 16520-5 EN. Luxembourg. |
[22] | Rentsch J, Jaus J, Roth K, Preu R. Economical and ecological aspects of plasma processing for industrial solar cell fabrication. Photovoltaic Specialists Conference, 2005. Conference Record of the Thirty-first IEEE; 2005 3-7 Jan.. IEEE, 931-934. |
[23] | Agostinelli G, Choulat P, Dekkers HFW, et al.. Advanced dry processes for crystalline silicon solar cells. Photovoltaic Specialists Conference, 2005. Conference Record of the Thirty-first IEEE; 2005 3-7 Jan.. IEEE, 1149-1152. |
[24] | Lopez E, Dani I, Hopfe V, et al.. Plasma enhanced chemical etching at atmospheric pressure for silicon wafer processing. European Photovoltaic Solar Energy Conference; 2006 4-8 Sept.; Dresden, Germany. Fraunhofer-Publica. 1161-1166. |
[25] | Lopez E, Beese H, Mäder G, et al.. New developments in plasma enhanced chemical etching at atmospheric pressure for crystalline silicon wafer processing. The compiled state-of-the-art of PV solar technology and deployment. 22nd European Photovoltaic Solar Energy Conference, EU PVSEC 2007. Proceedings of the international conference; 2007 3-7 Sept.; Milan, Italy. Fraunhofer-Publica. 1484-1487. |
[26] | Linaschke D, Leistner M, Mäder G, et al. Plasma Enhanced Chemical Etching at Atmospheric Pressure for Crystalline Silicon Wafer Processing and Process Control by In-Line FTIR Gas Spetroscopy. 21st European Photovoltaic Solar Energy Conference 2006. Proceedings; 2008 1-5 Sept.; Valencia, Spain. Fraunhofer-Publica.1907-1910. |
[27] | Photovoltaics World, Champions of Photovoltaics: Cells and Modules. Photovoltaics World, 2011. Available from: http://www.renewableenergyworld.com/rea/news/article/2011/12/champions-of-photovoltaics-cells-and-modules. |
[28] | Dresler B, Köhler D, Mäder G, et al. (2012) Novel Industrial single sided dry etching and texturing process for silicon solar cell improvement. 27th European Photovoltaic Solar Energy Conference and Exhibition 1825-1828. |
[29] | International Standards Organisation (2006) Environmental management-life cycle assessment-principles and framework. International Organization for Standardization, Geneva, Switzerland. |
[30] | International Standards Organisation (2006) Environmental management-life cycle assessment-Requirements and Guidelines. International Organization for Standardization, Geneva, Switzerland. |
[31] | Andrae ASG (2009) Global life cycle impact assessments of material shifts: the example of a lead-free electronics industry. Springer. |
[32] | Frischknecht R, Stucki M (2010) Scope-dependent modeling of electricity supply in life cycle assessments. Int J LCA 15:806-816. |
[33] | European Commission Joint Research Centre Institute for Environment and Sustainability (2010) International Reference Life Cycle Data System (ILCD) Handbook—General guide for Life Cycle Assessment—Detailed guidance. First edition March 2010. EUR 24708 EN. Luxembourg. Publications Office of the European Union. |
[34] | Institute of Environmental Sciences (CML) Faculty of Science, CML-IA Characterisation Factors. Leiden University Institute of Environmental Sciences (CML), 2013. Available from: http://cml.leiden.edu/software/data-cmlia.html. |
[35] | Dominguez-Ramos A, Aldaco R, Irabien A (2007) Life cycle assessment as a tool for cleaner production: Application to aluminium trifluoride. Int J Chem Reactor Eng 5(1): 1542-6580. |
[36] | Weidema B, Wesnaes M (1996) Data quality management for life cycle inventories—an example of using data quality indicators. J Cleaner Prod 4(3-4):167-174. |
1. | Yongmin Zhang, Pengcheng You, Lin Cai, Optimal Charging Scheduling by Pricing for EV Charging Station With Dual Charging Modes, 2019, 20, 1524-9050, 3386, 10.1109/TITS.2018.2876287 | |
2. | Ruilong Deng, 2020, Chapter 43-1, 978-981-4585-87-3, 1, 10.1007/978-981-4585-87-3_43-1 | |
3. | R. S. Sachdev, Omveer Singh, 2016, Consumer's demand response to dynamic pricing of electricity in a smart grid, 978-1-4673-9084-2, 1, 10.1109/ICCCCM.2016.7918236 | |
4. | Ruilong Deng, 2022, Chapter 43, 978-981-287-250-0, 681, 10.1007/978-981-287-251-7_43 | |
5. | Yongmin Zhang, Lin Cai, Dynamic Charging Scheduling for EV Parking Lots With Photovoltaic Power System, 2018, 6, 2169-3536, 56995, 10.1109/ACCESS.2018.2873286 | |
6. | Yaqin Zhou, Rajnish Kumar, Shaojie Tang, Incentive-Based Distributed Scheduling of Electric Vehicle Charging Under Uncertainty, 2019, 34, 0885-8950, 3, 10.1109/TPWRS.2018.2868501 | |
7. | Hojun Jin, Sangkeum Lee, Sarvar Hussain Nengroo, Dongsoo Har, Development of Charging/Discharging Scheduling Algorithm for Economical and Energy-Efficient Operation of Multi-EV Charging Station, 2022, 12, 2076-3417, 4786, 10.3390/app12094786 | |
8. | Saba Askari Noghani, Paolo Scarabaggio, Raffaele Carli, Mariagrazia Dotoli, 2024, Solar-Powered Electric Vehicles into V2G-Capable Smart Parking Infrastructure for Enhanced Energy Efficiency, 979-8-3503-7397-4, 575, 10.1109/CoDIT62066.2024.10708524 | |
9. | Hitesh Kumar Verma, Nikhil Gupta, Praveen Kumar Agrawal, K. R. Niazi, Anil Swamkar, 2024, Coordinated Electric Vehicle Charging Strategy for Self-Sustained Office Parking Lots, 979-8-3503-6706-5, 1, 10.1109/PIICON63519.2024.10995126 |
Bus number | Maximum voltage / p.u. | Minimum voltage / p.u. |
3 |
0.9925+j0.0772 |
0.9962 + j0.0386 |
4 | 0.9929+j0.0810 | 0.9964 + j0.0405 |
5 | 0.9932+j0.0841 | 0.9965 + j0.0420 |
6 | 0.9935+j0.0821 | 0.9967 + j0.0410 |
7 | 0.9939+j0.0837 | 0.9969 + j0.0418 |
8 | 0.9880+j0.1316 | 0.9940 + j0.0658 |
9 | 0.9880+j0.1346 | 0.9944 + j0.0680 |
10 | 0.9914+j0.1401 | 0.9957 + j0.0700 |
11 | 0.9887+j0.1344 | 0.9944 + j0.0671 |
12 | 0.9899+j0.1360 | 0.9949 + j0.0679 |
13 | 0.9892+j0.1355 | 0.9946 + j0.0677 |
14 | 0.9881+j0.1329 | 0.9940 + j0.0664 |
Bus number | Maximum voltage / p.u. | Minimum voltage / p.u. |
3 |
0.9925+j0.0772 |
0.9962 + j0.0386 |
4 | 0.9929+j0.0810 | 0.9964 + j0.0405 |
5 | 0.9932+j0.0841 | 0.9965 + j0.0420 |
6 | 0.9935+j0.0821 | 0.9967 + j0.0410 |
7 | 0.9939+j0.0837 | 0.9969 + j0.0418 |
8 | 0.9880+j0.1316 | 0.9940 + j0.0658 |
9 | 0.9880+j0.1346 | 0.9944 + j0.0680 |
10 | 0.9914+j0.1401 | 0.9957 + j0.0700 |
11 | 0.9887+j0.1344 | 0.9944 + j0.0671 |
12 | 0.9899+j0.1360 | 0.9949 + j0.0679 |
13 | 0.9892+j0.1355 | 0.9946 + j0.0677 |
14 | 0.9881+j0.1329 | 0.9940 + j0.0664 |