An overview of small hydro power development in India

  • Received: 13 August 2020 Accepted: 15 September 2020 Published: 21 September 2020
  • India is a developing nation with 1.35 billion populations living in varied strata of living standards. Therefore, the energy demand is constantly increasing in an effort to accelerate industrial activities and boost the economy. The country mostly meets its electricity demand from fossil fuel. It has large generation capacity but in some remote and rural areas only 53% of the villages get electric supply for less than 12 hours a day. This is because of hilly and mountainous terrains especially in the north and north-eastern regions of the country and absence of utility grid owing to economic reasons. It is estimated that about 15% of country's population do not have access to electricity. With huge hydro potential in the country, especially in the Himalayan States, hydropower generation may be emphasized and pressed in to augment ever increasing energy demand. The emphasis should be on small hydropower (SHP) as construction of large hydropower involves huge capital cost and they are associated with various techno-economic and social issues. The article aims to provide important information for appropriate policy making in developing small hydropower in India.

    Citation: Oying Doso, Sarsing Gao. An overview of small hydro power development in India[J]. AIMS Energy, 2020, 8(5): 896-917. doi: 10.3934/energy.2020.5.896

    Related Papers:

    [1] Manali Raman, P. Meena, V. Champa, V. Prema, Priya Ranjan Mishra . Techno-economic assessment of microgrid in rural India considering incremental load growth over years. AIMS Energy, 2022, 10(4): 900-921. doi: 10.3934/energy.2022041
    [2] Ashebir Dingeto Hailu . Ethiopia hydropower development and Nile basin hydro politics. AIMS Energy, 2022, 10(1): 87-101. doi: 10.3934/energy.2022006
    [3] Gul Ahmad Ludin, Mohammad Amin Amin, Assadullah Aminzay, Tomonobu Senjyu . Theoretical potential and utilization of renewable energy in Afghanistan. AIMS Energy, 2017, 5(1): 1-19. doi: 10.3934/energy.2017.1.1
    [4] Tilahun Nigussie, Wondwossen Bogale, Feyisa Bekele, Edessa Dribssa . Feasibility study for power generation using off- grid energy system from micro hydro-PV-diesel generator-battery for rural area of Ethiopia: The case of Melkey Hera village, Western Ethiopia. AIMS Energy, 2017, 5(4): 667-690. doi: 10.3934/energy.2017.4.667
    [5] Pugazenthi D, Gopal K Sarangi, Arabinda Mishra, Subhes C Bhattacharyya . Replication and scaling-up of isolated mini-grid type of off-grid interventions in India. AIMS Energy, 2016, 4(2): 222-255. doi: 10.3934/energy.2016.2.222
    [6] Mohammad Masih Sediqi, Harun Or Rashid Howlader, Abdul Matin Ibrahimi, Mir Sayed Shah Danish, Najib Rahman Sabory, Tomonobu Senjyu . Development of renewable energy resources in Afghanistan for economically optimized cross-border electricity trading. AIMS Energy, 2017, 5(4): 691-717. doi: 10.3934/energy.2017.4.691
    [7] Vincent Katutsi, Milly Kaddu, Adella Grace Migisha, Muhumuza Ezra Rubanda, Muyiwa S Adaramola . Overview of hydropower resources and development in Uganda. AIMS Energy, 2021, 9(6): 1299-1320. doi: 10.3934/energy.2021060
    [8] Zubairu Ismaila, Olugbenga A. Falode, Chukwuemeka J. Diji, Omolayo M. Ikumapayi, Adetokunbo A. Awonusi, Sunday A. Afolalu, Esther T. Akinlabi . A global overview of renewable energy strategies. AIMS Energy, 2022, 10(4): 718-775. doi: 10.3934/energy.2022034
    [9] Sunimerjit Kaur, Yadwinder Singh Brar, Jaspreet Singh Dhillon . Multi-objective real-time integrated solar-wind-thermal power dispatch by using meta-heuristic technique. AIMS Energy, 2022, 10(4): 943-971. doi: 10.3934/energy.2022043
    [10] Shota Tobaru, Ryuto Shigenobu, Foday Conteh, Naomitsu Urasaki, Abdul Motin Howlader, Tomonobu Senjyu, Toshihisa Funabashi . Optimal operation method coping with uncertainty in multi-area small power systems. AIMS Energy, 2017, 5(4): 718-734. doi: 10.3934/energy.2017.4.718
  • India is a developing nation with 1.35 billion populations living in varied strata of living standards. Therefore, the energy demand is constantly increasing in an effort to accelerate industrial activities and boost the economy. The country mostly meets its electricity demand from fossil fuel. It has large generation capacity but in some remote and rural areas only 53% of the villages get electric supply for less than 12 hours a day. This is because of hilly and mountainous terrains especially in the north and north-eastern regions of the country and absence of utility grid owing to economic reasons. It is estimated that about 15% of country's population do not have access to electricity. With huge hydro potential in the country, especially in the Himalayan States, hydropower generation may be emphasized and pressed in to augment ever increasing energy demand. The emphasis should be on small hydropower (SHP) as construction of large hydropower involves huge capital cost and they are associated with various techno-economic and social issues. The article aims to provide important information for appropriate policy making in developing small hydropower in India.


    The economic development and societal progress is highly influenced by per capita energy consumption. In order to fulfil the energy requirements, more and more electricity generation is essential. Presently, 74.4% of the energy utilized in the world is obtained from fossil fuel based generating stations. But such generating stations are deterrent to cleanliness of environment. The worldwide energy generation from renewable energy sources stands at 26% as shown in Figure 3 [1]. The leading top 5 countries in hydropower generation are China, Brazil, United States, Canada and India which accounts for 53.4% of total installed capacity in the world. China has the highest hydropower installed capacity of 320 GW which stands at 27.2% of the total installed capacity followed by Brazil, United States, Canada and India at 8.04%, 7.9%, 6.2% and 3.86% respectively. Thus, many researchers are working on the prospects of harnessing biomass, hydro, solar and wind energy sources in order to produce clean energy and reduce the environmental damages. Hydropower is considered as leading renewable energy source and is gaining importance in the map of worldwide electricity generation [2,3,4]. Hydropower is “clean energy” as it comes naturally and is one of the most cost effective and sustainable energy. It can be replenished much faster than being consumed. According to report of International Hydropower Association, 26 PWh of electricity was generated in the year 2019 and Figure 4 shows the contribution of different source used for electricity generation. It shows that 16% of the total generation were from hydropower so, basically hydropower contribute the highest of approximate 62.10% of the total electricity produced by renewable energy source [1]. Contribution of Hydropower is very important in electricity generation for future and International Energy Association (IEA) stated that Hydropower will continue to become main energy source of renewable energy source in 2024 [5]. According to report of IEA 2019, the hydropower electricity generation attained nearly 4, 200 terawatt hours (TWh) and an approximate hydropower of 23.8 gigawatts (GW) capacity was put into operation bringing the world’s installed capacity to 1, 292 gigawatts (GW). The East Asia and Pacific region shows the fastest growth with 9.2 GW of hydropower installed capacity added to it. The total installed capacity and generation by region are represented through Table 1 and Figure 1 represent the new installed capacity by region.

    Table 1.  Total installed hydropower capacity and generation by region [1].
    Sl No. Region Total Installed Capacity (MW) Generation (TWh)
    1 Africa 36, 264 138
    2 South and Central Asia 148, 511 439
    3 East Asia and Pacific 480, 426 1, 534
    4 Europe 251, 707 643
    5 North and Central America 204, 056 720
    6 South America 170, 792 726
    Total 1, 291, 756 4200

     | Show Table
    DownLoad: CSV
    Figure 1.  New installed hydropower capacity by region (GW) [1].
    Figure 2.  Leading top 5 countries in new installed hydropower capacity in 2018 [1].
    Figure 3.  Total energy generation across the world [1].
    Figure 4.  Electricity generation by source [1].
    Figure 5.  Total installed capacity in India [8].

    Many countries are also working to increase the hydropower capacity and in the year 2018 Forty eight countries added hydropower capacity among which China has the highest new installed capacity of 8, 540 MW. Figure 2 shows the top 5 countries with highest new installed capacity [1].

    Hydropower emits the lowest greenhouse gas; it is predictable and has high efficiency. Because of its flexibility and reliability, such generating stations can be integrated with any other emerging energy systems and hence, hydropower is implemented on large and small scale power generation. Large hydropower, however, is associated with displacement of people, submergence of land in the catchment area, risk of dam malfunction, damage to ecosystem, etc. These issues are usually absent in small hydropower and it is found to be extremely beneficial in supplying electricity, especially to remote and rural areas where grid accessibility is constrained [6,7]. Utilizing hydropower for electricity generation in place of coal prevents release of 148 million tonnes of particulate, 62 million tonnes of sulphur dioxide and 8 million tonnes of nitrogen oxide every year. India has abundant water resources that can be harnessed for electricity generation. Thus, the prospects of hydropower in India need to be relooked with greater zeal and scientific temper. This paper aims to present the status of the water resources focusing mainly on present conditions, various schemes and obstacles of small hydropower development in India and around the world.

    This article is based on studies and analyses of latest scientific literatures presented in journals and conferences, data obtained from various ministries of the government of India and books related to hydropower development. Extensive literature review is carried out and eventually large and small hydropower is segregated and a detail discussion is presented against short hydropower in India category. The article is divided in 5 section which cover status of SHP in India, review of recent article on SHP in India, policies and schemes of SHP development, challenges of SHP development, areas of research in SHP and conclusion.

    India is a country with 1.35 billion population and third largest electricity energy consumer in the world after China and US. According to Key World Energy Statics 2019, India is the third largest producer of electricity in the world with the generation of 1, 561 TWh. Although power generation has stretched more than 100 times since independence in 1947, the energy demand is ever increasing due to accelerating economic activities. In order to boost growth in primary sectors such as agriculture, industrial or manufacturing and service sectors abundant availability of electricity is inevitable. Electricity is one of the eight core industries of India and thus, it directly correlates electricity usage and economic development. By providing access to electricity, the country is putting all out efforts to reduce poverty. At present the total installed capacity of India is 370, 106 MW and the contributions of various sources of electricity are presented in Figure 5. It can be seen that fossil fuel such as coal, natural gas, and oil contributes 62.7% of electricity generation [8]. It is anticipated that energy demand will be more than double by 2030, while electricity demand will be almost triple [9]. But studies have shown that most of the fossil fuels will be exhausted by 22nd century. Therefore, shifting attention to generation of electricity from renewable energy sources needs to be emphasized. Government of India has targeted increase in renewable generation up to 175 GW by 2022 [10]. Presently India is 5th largest producer of hydro power energy in the world with an installed capacity of 45, 699 MW as on April 24, 2020 with more than 80% of the hydropower capacity being distributed among the Himalayan States. However, hydro power contributes only 12.4% of the total installed capacity in the country [9]. In India hydropower are commonly classified into small and large hydropower. The large hydropower is governed by Ministry of Power and small hydropower up to 25 MW is looked after by the Ministry of New and Renewable Energy [11]. The large hydropower is often opposed by societies, environmentalist and non-governmental organizations for fear of flooding, desertification, relocation issues, etc. Therefore, small hydropower can be envisaged as a better solution for electricity generation. Small hydropower is usually clean, sustainable and environmental friendly as most of the SHPs are canal based or run of river type which uses running water to drive the turbine. The weir or barrage is small and no water is stowed; it is free from problems such as relocation of local inhabitants or deforestation which are usually associated with large hydropower [12]. Because SHPs are sustainable, they are exempted from forest and land clearance and are free from public sitting/plenary inquiry in many countries including India [13,14]. SHPs are economically feasible and the gestation period is rather low [15]. SHPs are ideal for powering villages and far-flung or isolated areas. The accessibility of electricity in these areas will boost small scale industries and thereby improve the socio-economic status of the people [16,17]. SHP does not emit greenhouse gas; and lesser greenhouse gas means lesser carbon foot print thus, decreased CO2 release [18]. The capacity of SHP is different in different countries; for instance, in China, capacity up to 50 MW is considered as SHP while in USA the capacity is up to 100 MW [12]. The classification of SHP in India is shown in Table 2 and Table 3 shows the attainment of small hydropower along with other renewable source in grid connected renewable power in the country [19].

    Table 2.  Classification of SHP.
    Sl. No. Plant Capacity Type
    1. Up to 5 kW Pico
    2. Up to 100 kW Micro
    3. 101-2000 kW Mini
    4. 2001-250000 kW Small

     | Show Table
    DownLoad: CSV
    Table 3.  Attainment in grid connected renewable network [19].
    Renewable Source Attainment (MW) (April-Dec 2019) Cumulative Attainment (MW) as on 31 December 2019
    Bio Power 83.00 9861.31
    Solar Power-Ground Mounted 5013.00 31379.30
    SHP 78.40 4671.55
    Solar Power-Roof Top 536.88 2333.23
    Wind Power 1879.21 37505.18
    Waste to Power 1.50 139.80
    Total 7591.99 85908.37

     | Show Table
    DownLoad: CSV

    From 7, 133 odd sites situated in different parts of the country, the approximated potential of SHP in India is 21.13 GW out of which 1, 127 SHP plants contributes to 4, 671.55 MW installed capacity as recorded till December 31, 2019; another 109 SHP plants are in different phases of completion. SHPs are implemented by both public and private sectors or collaboration of both to enhance the contribution of SHP in the power market of India. The growth of SHP for the last three years is shown in Figure 6 [19,20,21]. Table 4 presents the potential and installed capacity of SHP in India.

    Figure 6.  Growth of SHP in India [19,20,21].
    Table 4.  State wise details of SHP potential, installed capacity and under implementation [19].
    States Potential SHP Installed SHP under execution
    No. Capacity (MW) No. Capacity (MW) No. Capacity (MW)
    1. Andhra Pradesh 359 409.32 44 162.110 0 0
    2. Arunachal Pradesh 800 2064.92 156 131.105 10 7.05
    3. Assam 106 201.99 6 34.110 1 2
    4. Bihar 139 526.98 29 70.700 0 0
    5. Chhattisgarh 199 1098.2 10 76.000 0 0
    6. Goa 7 4.7 1 0.050 0 0
    7. Gujarat 292 201.97 13 62.352 9 48.81
    8. Haryana 33 107.4 9 73.500 0 0
    9. Himachal Pradesh 1049 3460.34 195 906.510 18 179.60
    10. Jammu & Kashmir 302 1707.45 46 180.480 16 47.10
    11. Jharkhand 121 227.96 6 4.050 0 0
    12. Karnataka 618 3726.40 170 1280.73 3 13.000
    13. Kerala 238 647.15 34 222.02 8 80.500
    14. Madhya Pradesh 299 820.44 12 95.91 2 7.600
    15. Maharashtra 270 786.46 70 379.575 9 10.400
    16. Manipur 110 99.95 8 5.45 0 0.000
    17. Meghalaya 97 230.05 5 32.53 2 25.500
    18. Mizoram 72 168.9 18 36.47 4 8.700
    19. Nagaland 98 182.18 12 30.67 1 1.000
    20. Odisha 220 286.22 10 64.625 3 57.000
    21. Punjab 375 578.28 56 173.55 7 4.900
    22. Rajasthan 64 51.67 10 23.85 0 0
    23. Sikkim 88 266.64 17 52.11 1 3.000
    24. Tamil Nadu 191 604.46 21 123.05 0 0
    25. Telangana 94 102.25 30 90.87 0 0
    26. Tripura 13 46.86 3 16.01 0 0
    27. Andaman & Nicobar Islands 7 7.27 1 5.25 0 0
    28. Uttar Pradesh 251 460.75 9 25.1 2 25.500
    29 Uttarakhand 442 1664.31 102 214.32 13 7.580
    30 West Bengal 179 392.06 24 98.5 0 0
    Total 7133 21133.62 1127 4671.557 109 529.240

     | Show Table
    DownLoad: CSV

    From the Table 4, it can be seen that the State of Karnataka has the highest installed capacity followed by Himachal Pradesh and Maharashtra. The north and north eastern region of India has high potential of SHP; the north eastern part of India is often called ‘Future Power House’ of India [22]. Table 5 details the tariff figures of SHP for the year 2019-20; it shows that the capital cost of the SHP plant is inversely proportional to plant size [23]. Government of India is promoting accelerated development of SHP and in the year 2019-20, 12 SHP projects were commissioned out of which 6 projects are in the State of Himachal Pradesh with generating capacity of 45.9 MW and is illustrated in Figure 7 [19].

    Table 5.  Tariff figures for 2019-20 for SHP [23].
    Sl. No. Region SHP Size (MW) Capital Cost
    (INR Million/MW) (USD Million/MW)
    1. Himachal Pradesh, Uttarakhand, West Bengal and North Eastern States Less than 5 100 1.39
    2. Himachal Pradesh, Uttarakhand, West Bengal and North Eastern States Between 5 to 25 90 1.25
    3. Other states Less than 5 77.9 1.08
    4 Other states Between 5 to 25 70.7 0.98

     | Show Table
    DownLoad: CSV
    Figure 7.  SHP commissioned between 2019 and 2020 [19].

    In this section, recent articles published between 2015 and 2020 are exhaustively reviewed and it is found that most of the studies discusses the environmental impact of SHP while few literatures details technological interventions. Table 6 summarizes the outcome of various studies carried out on SHP in India.

    Table 6.  Summary of articles on SHP in India and their findings.
    Year Sl. No. Authors Remarks
    2015 1. Mishra, M. K. et al. [12] (i) Almost 75% of SHP potential in remote and isolated part of India is not harnessed. (ii) MNRE is playing a vital role in the development, operation and dissemination of SHP. (iii) Delay in permission, approval and agreement retards the progress of SHP. (iv) Efforts should be made to increase penetration of SHP and aim to add power of 600 MW/year.
    2. Khan, Rakshanda [24] (i) SHP has both positive and negative aspects. (ii) SHP is not completely environmental friendly. It impacts the environment to some extent as it disturbs the river ecologies but produces no waste. (iii) SHP improves the socio-economic status for example, the villager get employed and reduced movement of people to cities results in setting up of schools, hospitals, etc. (iv) Social harmony should be established between the employees and the stakeholders to improve the performance of SHPs. (v) Foreign subsidies can help independent power producer with low interest rates and improve production services.
    3. Gohil, Pankaj P. [25] Hydraulic turbine corrosion due to cavitation causes loss to SHP.
    4. Sachdev, Hira Singh et al. [26] (i) SHP is solution for providing electricity to steep and mountainous areas where there is no grid connectivity. (ii) For precise computation of hydro potential, uncertainty in the systems should be considered and thus, mathematical modeling and simulations survey is encouraged in the subject of energy.
    5. Sharma, Ameesh Kumar [27] (i) Western Himalayan region has a large SHP potential. (ii) SHP can be the mainstay of power sector in the State of Jammu and Kashmir; however, the growth is rather slow. (iii) To prevent the delay in approval of new SHPs, the process
    should be fast tracked with time bound mechanism as practised in the State of Himachal Pradesh. (iv) The utilization of hydropower potential of Jammu and Kashmir is impacted by Indus Valley Water Treaty (IWT). (v) Environmental impact assessment (EIA), environmental management plan (EMP) and social impact assessment (SIA) reports are made compulsory for implementation of SHPs.
    2016 1. Sharma, Ameesh Kumar [28] (i) Jammu and Kashmir, Himachal Pradesh, Uttarakhand and Arunachal Pradesh have huge hydropower potential. (ii) SHPs may play an important role for the development of the regions which are not grid connected. (iii) Private players attracted to build SHPs.
    2. Diduck, Alan Paul [29] (i) Marginalization of SHP has left a vital gap in India’s environmental assessment regime. (ii) Improved project-level assessment and better mechanism to involve locals are required for successful implementation of SHP.
    3. Kumar, Deepak [30] (i) Environmental impact of SHPs is not little as ordinarily viewed. (ii) It is suggested that EIA report may be dispensed with for installed capacity up to 5 MW as against the existing 25 MW capacity for SHP. (iii) The local residents support installation of SHP. (iv) It is recommended that untouched rivers must not be used for installing SHP without Cumulative Environment Impact Assessment (CEIA).
    4. Hö ffken, Johanna I. [31] (i) The access to electricity is poor in India especially, in rural areas where extension of grid becomes expensive or not feasible. In such areas micro hydro plants are welcoming solutions. (ii) SHP can be made more viable by involving people in numerous aspects of the SHP and instil sense of community ownership.
    2017 1. Sharma, Ameesh Kumar [32] (i) Often SHP causes long-standing unfavourable effects on the environment because of improper designing. (ii) In order to expedite induction of more SHPs in the State of Jammu and Kashmir proper planning is needed for their sustainability. (iii) Government agencies involved in implementing SHPs should educate local people about the benefits of such power projects.
    It should be emphasised how such projects can improve the socio-economic status apart from getting electricity at the door. (iv) More private developers should be involved.
    2. Sharma, Ameesh Kumar [33] (i) Invite more private investors or power developers so that full potential is harnessed in specified time frame. (ii) To accelerate speedy growth of SHP, a single window clearance method is suggested wherein common No Objection Certificate (NOC) is provided on account of other departments from where the acceptance/agreement is needed.
    2018 1. Singh, Vineet Kumar et al. [34] Water discharge, available head, head loss, penstock diameter and length, effectiveness and running cost affects the performance of SHP.
    2. Rana, Shilpesh [35] Weighted product method (WPM) and TOPSIS method may be used to identify the best site for SHP.
    2019 1. Roy Sr, Neha Chhabra [36] Effective risk management policies should be adopted in order to identify SHP potentials, weaknesses, opportunities and threats.
    2. Kumar, Arun [37] The accuracy of discharge measurement may be improved by properly defining an area where the flow is stable and debris free.
    3. Raghuwanshi, Santosh Singh [38] Owing to economic reasons Private power developers are showing interest in SHP projects.

     | Show Table
    DownLoad: CSV

    As per report of Mission Antyodaya about 53% of the villages in India receive electricity less than 12 hours a day [39]; it is also reported that about 15% population do not have access to electricity [40]. The economic development, therefore, is highly dispersed in the country. Currently, the GDP of the nation is about 4% only. In the backdrop of this kind of dismal economy, production of electricity utilizing renewable energy sources would be a welcome step. The advantages of harnessing renewable energy sources are manifold; these energy sources are inexhaustible, usually the gestation period is low, cost per unit energy is lower, etc. Thus, SHP presents a viable option as it is a clean source of energy and its peak power generation is in summer that coincides with the period when maximum power demand occur. As on date, many policies and schemes are in place to encourage the development of SHP projects in the country. The first SHP was installed before independence with a capacity of 130 kW in the hills of Darjeeling. Table 7 presents the chronology of SHP development along with the relevant policies and schemes in place in the country.

    Table 7.  SHP development along with the relevant policies and schemes.
    Year Activity
    1887 First SHP was installed in India [12] with a capacity of 130 kW; capacity upgraded to 508 MW by 1947.
    1982 Looking at the SHP potential Government of India established Alternative Hydro Energy Centre at IIT Roorkee [12].
    1989 Hydro power projects upto capacities of 3 MW were placed under the Ministry of Non- conventional Energy Sources (MNES) [41].
    1994 Invite and involve Private power developers in SHP development [41].
    1999 Hydro power projects upto capacity of 25 MW were transferred to Ministry of New and Renewable Energy(MNRE), earlier known as MNES from Ministry of Power [42]
    2003 Electricity Act 2003 [43] was promulgated which mandates the promotion of electricity generation from renewable energy sources by offering proper procedures for grid connection.
    2005 National Electricity Policy 2005 [44] was adopted which stipulated that progressively the stake/segment of electricity from renewable energy required to be enhanced; the purchase by distributors/supply companies shall be done through competitive biddings.
    2006 Adopted Traffic Policy 2006 [44]. It mandates each State Electricity Regulatory Commissions to agree Renewable energy Purchase Obligation by distribution licensees before deadline/specified time. The policy has facility for renewable endorsement as in provisions of section 86 (1) (e) of the Electricity Act 2003; an Appropriate Commission shall fix a minimum percentage for acquiring energy from renewable sources taking into account availability of such resources in the region and its impact on retail tariffs.
    2008 National Action Plan on Climate Change [45] envisages increasing share of renewable energy into electricity production in order to control climate change.
    2008 According to Policy on Hydro Power [46] soft loans were proposed to be given through Power Finance Corporation/ Indian Renewable Energy Development Agency Limited /Rural Electrification Corporation and other financial institutions.
    2010 Renewable Energy Certificate [47] was initiated to permit the States of India to achieve Renewable Purchase Obligation targets.
    2010 Ladakh Renewable Energy Initiative [48] was initiated to encourage and promote renewable energy include SHP in the Ladakh region.
    2012 State Initiative [49,50] encourages SHP development. 23 States announced schemes for private sector involvement in order to boost the growth of SHP.
    Under various Financial schemes [51,52] the Indian Renewable Energy Development Agency (IREDA) under MNRE offers loans for SHP projects and provide special incentive package for the promotion of the SHP programme in the Northeast region of India.
    2015 INR 23.5 billion and INR 20.0 billion were spent for renewable energy and SHP respectively under Development/Reconstruction package for Jammu and Kashmir [21].
    2016 National Tariff Policy [53] envisages special attention on renewable energy to promote use of renewable energy.
    2016 In Paris Climate Change summit [10], Government of India expressed its desire to meet the INDC (Intended Nationally Determined Contribution by generating about 40% of the country’s energy from renewable energy sources. Hydropower generation will help meet this target.
    2017 To help the stressed and stalled projects, Government of India announced INR 160 billion bailout for the hydropower sector [54].
    Set up Sediment Monitoring and Abrasion Testing Laboratory at AHEC, IIT Roorkee [21,55] to carry out study and research sediment components and its effect in hydropower.
    2018 Set up Hydraulic Turbine Research and Development Laboratory at AHEC, IIT Roorkee [20,56] for developing expertise in SHP in respect of entrepreneurs, engineers, plant operators and researchers; also providing affordable facility to small hydro manufacturer for design verification.
    2019 · Declaration of large hydropower with capacity above 25 MW as Renewable Energy Source [57]. · 1127 SHP projects with an approximate capacity of 4671.557 MW achieved as on 31.12.2019 [19].

     | Show Table
    DownLoad: CSV

    Table 8 shows recently commissioned SHPs in the country. Photographs of the power projects are also presented from Figure 8 to 10.

    Table 8.  Recently commissioned SHPs.
    Sl. No. Year Name of SHP Capacity Location
    1. 2017 Biaras SHP [21] 1.3 MW Drass, Kargil, Jammu and Kashmir
    2. 2018 Zhangdongrong SHP [20] 1.0 MW West Kameng, Arunachal Pradesh
    3. 2019 Dikshi SHP [19] 24.0 MW West Kameng, Arunachal Pradesh
    4. 2019 Nuranang SHP [19] 1.0 MW Tawang, Arunachal Pradesh

     | Show Table
    DownLoad: CSV
    Figure 8.  Biaras SHP [21].
    Figure 9.  Zhangdongrong SHP [20].
    Figure 10.  Dikshi SHP [19].

    Various stages of implementation of SHP are presented in Table 9. SHP generation necessitates enthusiastic participation of three main stakeholders namely, the developer, the government departments and the project affected people. Non-cooperation amongst the stakeholders in the procedure might cause delay in SHP development resulting in cost escalation and gestation period.

    Table 9.  Steps for implementation of SHP.
    Steps for implementation of SHP
    1.Identification or selection of SHP site
    2.Evaluation
    3.Submission of pre-feasibility report
    4.Obtaining no objection certificate or clearance certificate by the developer
    5.Submission of detailed report
    6.Grant of techno-economic clearance
    7.Signing of implementation agreement
    8.Signing of power purchase agreement
    9.Funding arrangement
    10.Arrangement of equipment and manpower
    11.Construction
    12.Completion and commission

     | Show Table
    DownLoad: CSV

    Planning and development of SHP endures many hurdles. The datasheet of head and discharge is fundamental to proper design of an SHP. The river flow changes with season thus, measurement of flow rate should be carried out throughout the year in order to obtain proper discharge data, a minimum of 5 years data should be collected; the absence of genuine data causes improper estimate of the power potential [12]. Sedimentation is another issue that is often faced in developing hydropower projects. Absence of geological and sedimentation data has resulted in wrong design and caused closure of many hydropower projects [58]. Problems are faced in acquiring land due to delay in obtaining permission from community or from department like forest and environment [58,59]. Shortage of manpower for planning and developing results in slow progress of SHP [58]. Lack of participation from local community [31], non-compliance of Renewable Purchase Obligation by States [47], lack of knowledge about SHP, isolated land and very small size SHP sometimes adversely affect the plant economy [12]. Thus, developing an SHP involves complex procedures and requires meticulous steps to decide the site, unit size and generating equipment [60]. Many SHPs are scrapped due to low consumption of electricity and limited funding from the government in terms of maintenance cost. Usually the life span of SHP is 35-50 years but some SHPs are closed down even before the end of the expected life due to faults in design and construction, obsolete equipment or non-availability of grid extension which causes huge waste of resources [61]. Along with regular maintenance, SHPs require check on the possibility of breakdown [62]. Often environmentalists pose delay in implementation of SHP as the normal procedure is not all allowed. This is due to the popular belief that the movement of personnel and equipment during construction invade wildlife habitats; also the operations of turbines or generators create noise which affects the local community. It is considered that the transmission lines may causes adverse effect to the local birds due to corona and magnetic effects around the conductors. It is also believed that the water passing through the machinery equipment may pollute or change the character of the river, increase the water temperature and affects the lives of aquatic flora and fauna [32,63,64]. Marginalization and unequal distribution of benefits of SHP is another factor that may slow down the development as the local community feel deceived and does not participate while the ecosystem and water bodies are disturbed [65]. Dissatisfaction on land compensation amongst the land donors also results in slow down of the entire process as it involves long process of dialogue between the stakeholders [66,67]. The lack of information between the developers and local community may impede the growth of SHP [68,69].

    There are many factors affecting successful implementation or operation of SHPs. Many of those problems are adequately addressed by the power developers however academics are still investigating all possible remedies to present the SHPs a better source of electricity generation. Table 10 illustrates some of the works carried out by researchers to make SHP more efficient, more economical and environment friendly.

    Table 10.  Research areas.
    Sl. No. Area of studies Author (s) Remarks
    1. Fish friendly turbine Martinez, Jayson J [70] Vowels, Andrew S [71] Robb, Drew [72] Focussed on minimizing the risk of injury or death to fish in the river.
    2. Location of hydro projects Ioannidou [73] Presents multi-objective optimization method with objectives of increasing hydropower production while reducing disturbance on river.
    Serpoush [74] Suggests methods to locate best hydro project sites.
    3. Hydro abrasive erosion turbine Sangal, Saurabh [75] Presents methods for designing hydro-abrasive erosion free turbine to alleviate erosion.
    4. Materials Ueda, T [76], Thapa, Biraj [77] Study of new materials
    to increase life span of turbines while reducing the environmental damage is presented.
    5. Hydrokinetic turbine Elbatran, A [78], Schleicher [79], Anyi, Martin [80], Riglin, Jacob [81] Design of turbines for minimum initial and running cost is carried out.
    Hrvoje Dedić-Jandrek [82] Focussed on achieving maximum efficiency based on inclination angle.
    Hosnar, Jernej [83] Presents models for obtaining necessary data for evaluation of hydro energy projects.
    Berrada [84] Presents optimization techniques for evaluating the system for increased benefit.
    6. Variable speed scheme Breban, S [85] Study of variable speed scheme is carried out which permit turbine speed to vary with the discharge.
    7. Sizing of plant Anagnostopoulos [86], Punys, Petras [87], Berrada, Asmae [88] Focus on optimization tools for sizing power plants.
    8. Sediment bypass tunnel Sumi [89], Auel, Christian [90] Aims to provide a sustainable solution in terms of sediment management.

     | Show Table
    DownLoad: CSV

    The article presented that there are many places in India where hydropower remains as untapped resource and extensive literature review is carried out and the feasibility and challenges of implementing small hydropower projects are detailed. Small hydropower emits less greenhouse gas and can be replenished over a period of time and hence, it can certainly play a major role in the future energy generation. However, it is found that many potential SHP sites remain as untapped resource in India. Also it is found that the opinion of public/local people is very important for successful implementation and operation of SHPs. Therefore, emphasis may be given to increased involvement of community as well as research/science for developing innovative technologies in order to balance hydropower and river conservation.

    The authors declare no conflict of interest.

    1. Ms. Oying Doso- Contribute to the idea and research, collected the information and wrote the paper;

    2. Prof. Sarsing Gao- Supervised the work, devised the ideas and proof outline and review the paper.



    [1] 2019 hydro power status report sector trends and insights, 2019. Available from: https://www.hydropower.org/sites/default/files/publications-docs/2019_hydropower_status_report.pdf.
    [2] Yuksel I (2010) As a renewable energy hydropower for sustainable development in Turkey. Renewable Sustainable Energy Rev 14: 3213-3219.
    [3] Rojanamon P, Chaisomphob T, Bureekul T (2009) Application of geographical information system to site selection of small run-of-river hydropower project by considering engineering/economic/environmental criteria and social impact. Renewable Sustainable Energy Rev 13: 2336-2348.
    [4] Nautiyal H, Goel V (2020) Sustainability assessment of hydropower projects. J Clean Prod 265: 121661.
    [5] IEA Renewables 2019, Market analysis and forecast from 2019 to 2024, Fuel report-October, 2019. Available from: https://www.iea.org/reports/renewables-2019/power.
    [6] Schumann K, Saili L, Taylor R, et al. Hydropower and sustainable development: A journey, world energy congress. Available from: https://www.osti.gov/etdeweb/servlets/purl/21423147.
    [7] Nautiyal H, Singa, SK, Varun, et al. (2011) Small hydropower for sustainable energy development in India. Renewable Sustainable Energy Rev 15: 2021-2027.
    [8] MINISTRY OF POWER, GOVERNMENT OF INDIA, Power Sector at a Glance ALL INDIA as on 24-04-2020. Available from: https://powermin.nic.in/en/content/power-sector-glance-all-india.
    [9] REMAP RENEWABLE ENERGY PROSPECTS FOR INDIA, IRENA. Available from: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2017/May/IRENA_REmap_India_paper_2017.pdf.
    [10] India 2020-Energy Policy Review-NITI Aayog 2020. Available from: https://niti.gov.in/sites/default/files/2020-01/IEA-India%202020-In-depth-EnergyPolicy_0.pdf.
    [11] Sharma NK, Tiwari PK, Sood YR (2013) A comprehensive analysis of strategies, policies and development of hydropower in India: Special emphasis on small hydro power. Renewable Sustainable Energy Rev 18: 460-470.
    [12] Mishra MK, Khare N, Agrawal AB (2015) Small hydro power in India: Current status and future perspectives. Renewable Sustainable Energy Rev 51: 101-115.
    [13] Kumar D, Katoch SS (2015) Sustainability suspense of small hydropower projects: A study from western Himalayan region of India. Renewable Energy 76: 220-233.
    [14] Premalatha M, Tabassum-Abbasi Abbasi T, Abbasi SA (2014) A critical view on the eco-friendliness of small hydroelectric installations. Sci Total Environ 481: 638-643.
    [15] Okot DK (2013) Review of small hydropower technology. Renewable Sustainable Energy Rev 26: 515-520.
    [16] Nouni MR, Mullick SC, Kandpal TC (2009) Providing electricity access to remote areas in India: Niche areas for decentralized electricity supply. Renewable Energy 34: 430-434.
    [17] Bhide A, Monroy CR (2011) Energy poverty: A special focus on energy poverty in India and renewable energy technologies. Renewable Sustainable Energy Rev 15: 1057-1066.
    [18] Purohit P (2008) Small hydro power projects under clean development mechanism in India: A preliminary assessment. Energy Policy 36: 2000-2015.
    [19] Annual Report 2019-20, Ministry of New and Renewable Energy, Govt. of India. Available from: https://mnre.gov.in/img/documents/uploads/file_f-1585710569965.pdf.
    [20] Annual Report 2018-19, Ministry of New and Renewable Energy, Govt. of India. Available from: https://mnre.gov.in/img/documents/uploads/0ce0bba7b9f24b32aed4d89265d6b067.pdf.
    [21] Annual Report 2017-18, Ministry of New and Renewable Energy, Govt. of India. Available from: https://mnre.gov.in/img/documents/uploads/d6982ee8cce147288e7bf9434eebff55.pdf.
    [22] THAKUR J, 2020, Exploring the Hydropower Potential in India's Northeast, ORF Issue Brief No.341. Available from: https://www.orfonline.org/research/exploring-the-hydropower-potential-in-indias-northeast-61853/.
    [23] CERC. The proposed generic levellised generation tariff for various renewable energy technologies, for FY 2019-20. Available from: http://www.cercind.gov.in/2019/orders/Draft%20RE%20Tariff%20Order%20for%20FY%202019-20.pdf.
    [24] Khan R (2015) Small hydro power in India: Is it a sustainable business? Appl Energy 152: 207-216.
    [25] Gohil PP, Saini RP (2015) Effect of temperature, suction head and flow velocity on cavitation in a Francis turbine of small hydro power plant. Energy 93: 613-624.
    [26] Sachdev HS, Akella AK, Kumar N (2015) Analysis and evaluation of small hydropower plants: A bibliographical survey. Renewable Sustainable Energy Rev 51: 1013-1022.
    [27] Sharma AK, Thakur NS (2015) Resource potential and development of small hydro power projects in Jammu and Kashmir in the western Himalayan region: India. Renewable Sustainable Energy Rev 52: 1354-1368.
    [28] Sharma AK, Thakur NS (2016) Analyze the factors effecting the development of hydro power projects in hydro rich regions of India. Perspect Sci 8: 406-408.
    [29] Diduck AP, Sinclair AJ (2016) Small hydro development in the Indian Himalaya: implications for environmental assessment reform. J Environ Assess Policy Manage 18: 1650015.
    [30] Kumar D, Katoch SS (2016) Environmental sustainability of run of the river hydropower projects: A study from western Himalayan region of India. Renewable Energy 93: 599-607.
    [31] Hö ffken JI (2016) Demystification and localization in the adoption of micro-hydro technology: Insights from India. Energy Res Soc Sci 22: 172-182.
    [32] Kumar Sharma A, Thakur NS (2017) Assessing the impact of small hydropower projects in Jammu and Kashmir: A study from north-western Himalayan region of India. Renewable Sustainable Energy Rev 80: 679-693.
    [33] Kumar Sharma A, Thakur NS (2017) Energy situation, current status and resource potential of run of the river (RoR) large hydro power projects in Jammu and Kashmir: India. Renewable Sustainable Energy Rev 78: 233-251.
    [34] Singh VK, Singal SK (2018) Optimal operation of run of river small hydro power plant. Biophys. Econ Resour Qual 3: 10.
    [35] Rana SC, Patel JN (2020) Selection of best location for small hydro power project using AHP, WPM and TOPSIS methods. ISH J Hydraul Eng 26: 173-178.
    [36] Roy DNC, Roy DNG (2019) Risk management in small hydro power projects of uttarakhand: An innovative approach. IIMB Manage Rev, Available from: https://doi.org/10.1016/j.iimb.2019.10.012.
    [37] Raghuwanshi SS, Arya R (2019) Experiences in discharge measurements at Small Hydropower Stations in India. Flow Meas Instrum 69: 101605.
    [38] Raghuwanshi SS, Arya R (2019) Renewable energy potential in India and future agenda of research. Int J Sustainable Eng 12: 291-302.
    [39] Villages With Availability Of Electricity For Domestic Use, Mission Antyodaya, Ministry of Rural Development, last accessed on September 20, 2019. Available from: https://missionantyodaya.nic.in/ma2019/.
    [40] Alok RG 'Financing India's Renewable Energy Vision'. ORF Issue Brief No. 336, January 2020. Available from: Observer Research Foundation https://www.orfonline.org/research/financing-indias-renewable-energy-vision-60516/.
    [41] Ghosh SN Environmental hydrology and hydraulics: eco-technological practices for sustainable development. CRC Press, 2016. Available from: https://books.google.co.in/books?hl=en&lr=&id=jj7NBQAAQBAJ&oi=fnd&pg=PA1&dq=Environmental+Hydrology+and+Hydraulics:+Eco-technological+Practices+for+...+By+S+N+Ghosh&ots=7D4WWqkiNL&sig=q9NAe_GYv0YfKiF6JVC6Oj4NSLQ&redir_esc=y#v=onepage&q=Environmental%20Hydrology%20and%20Hydraulics%3A%20Eco-technological%20Practices%20for%20...%20By%20S%20N%20Ghosh&f=false.
    [42] Bhatia SC, Advanced renewable energy systems, (Part 1 and 2). CRC Press, 2014. Available from: https://books.google.co.in/books?id=8Eb7CAAAQBAJ&pg=PA282&lpg=PA282&dq=25+MW+transfer+to+MNRE+1998&source=bl&ots=74ICsh_qE5&sig=ACfU3U33xf6-K1ckVkOaGejhK3OAquVuhQ&hl=en&sa=X&ved=2ahUKEwiZhfXdmdHpAhX0xjgGHUGRAMgQ6AEwAHoECAoQAQ#v=onepage&q=25%20MW%20transfer%20to%20MNRE%201998&f=false.
    [43] Sharma NK, Tiwari PK, Sood YR (2012) Solar energy in India: Strategies, policies, perspectives and future potential. Renewable Sustainable Energy Rev 16: 933-941.
    [44] Ministry of Power of GoI. National Electricity Tariff Policy, 2006. Available from: https://www.iea.org/policies/4731-tariff-policy-2006.
    [45] GOI. National Action Plan on Climate Change, 2008. Available from: http://www.nicra-icar.in/nicrarevised/images/Mission%20Documents/National-Action-Plan-on-Climate-Change.pdf.
    [46] Ministry of Power of GoI. New Hydro Policy, 2008. Available from: http://www.ielrc.org/content/e0820.pdf.
    [47] Shrimali G, Tirumalachetty S (2013) Renewable energy certificate markets in India—A review. Renewable Sustainable Energy Rev 26: 702-716.
    [48] Lohan SK, Dixit J, Modasir S, et al. (2012) Resource potential and scope of utilization of renewable energy in Jammu and Kashmir, India. Renewable Energy 39: 24-29.
    [49] Central Electricity Regulatory Commission (CERC). Terms and conditions for tariff determination from renewable energy sources) regulations, 2012. Available from: http://www.cercind.gov.in/2012/regulation/CERC_RE-Tariff-Regualtions_6_2_2012.pdf.
    [50] Sustainable Sources of Energy India Energy Congress, 2013. Available from: https://www2.deloitte.com/content/dam/Deloitte/in/Documents/energy-resources/in-enr-india-energy-congress-2013-noexp.pdf.
    [51] Standing committee on energy (2010-2011), In: Fifteenth Lok Sabha, Ministry of New and Renewable Energy [Small and Mini Hydel Projects], Sixteenth Report, Lok Sabha Secretariat, New Delhi, March, 2011/Phalguna, Saka. Available from: https://www.indiawaterportal.org/sites/indiawaterportal.org/files/Small_%26_mini_hydel_projects_Standing_Committee_on_Energy_Sixteenth_Report_MNRE_2010-2011.pdf.
    [52] European small hydropower association (ESHA) Renewable Energy House, State of the art of small hydropower in EU-25. Available from: https://www.globalccsinstitute.com/archive/hub/publications/138218/State-art-small-hydropower-EU-25.pdf.
    [53] Power IBEF India Brand Equity Foundation, March, 2018. Available from: https://www.ibef.org/download/Power-March-20181.pdf.
    [54] Hydel outlook 2018. Electrical & Power Review, Green Zone. Available from: https://www.eprmagazine.com/green-zone/hydel-outlook-2018/.
    [55] Sediment Monitoring and Abrasion Testing Laboratory, AHEC, IIT Roorkee. Available from: https://www.iitr.ac.in/departments/HRE/uploads/brochures/Sediment_lab_brochure.pdf.
    [56] AHEC Hydraulic Lab Brochure 2018-IIT Roorkee. Available from: https://www.iitr.ac.in/sric/sntdoc/Hydraulic%20Turbine%20Laboratory.pdf.
    [57] F.No.15/12/2016-H-I(Pt.), Government of India, Ministry of Power. Measure to promote hydro power sector. Available from: https://powermin.nic.in/sites/default/files/webform/notices/Measures_to_Promote_Hydro_Power_Sector.pdf.
    [58] Bhattacharyya SC (2010) Shaping a sustainable energy future for India: management challenges. Energy Policy 38: 4173-4185.
    [59] Luthra S, Kumar S, Garg D, et al. (2015) Barriers to renewable/sustainable energy technologies adoption. Renewable Sustainable Energy Rev 41: 762-776.
    [60] Ardizzon G, Cavazzini G, Pavesi G (2014) A new generation of small hydro and pumpedhydro power plants: Advances and future challenges. Renewable Sustainable Energy Rev 31: 746-761.
    [61] Pang M, Zhang L, Bahaj AS, et al. (2018) Small hydropower development in Tibet: Insight from a survey in Nagqu Prefecture. Renewable Sustainable Energy Rev 81: 3032-3040.
    [62] Paish O (2002) Small hydro power: technology and current status. Renewable Sustainable Energy Rev 6: 537-556.
    [63] Bracken L, Bulkeley H, Maynard C (2014) Micro-hydro power in the uk: The role of communities in an emerging energy resource. Energy Policy 68: 92-101.
    [64] Briones-Hidrovo A, Uche J, Martínez-Gracia A (2019) Estimating the hidden ecological costs of hydropower through an ecosystem services balance: A case study from Ecuador. J cleaner prod 233: 33-42.
    [65] Reddy VR, Uitto JI, Frans DR, et al. (2006) Achieving global environmental benefits through local development of clean energy? The case of small hilly hydel in India. Energy Policy 34: 4069-4080.
    [66] Chandy T, Keenan RJ, Petheram RJ, et al. (2012) Impacts of hydropower development on rural livelihood sustainability in Sikkim, India: community perceptions. Mt Res Dev 32: 117-125.
    [67] Diduck AP, Pratap D, Sinclair AJ, et al. (2013) Perceptions of impacts, public participation, and learning in the planning, assessment and mitigation of two hydroelectric projects in Uttarakhand, India. Land Use Policy 33: 170-182.
    [68] Diduck A, Sinclair J, Pratap D, et al. (2007) Achieving meaningful public participation in the environmental assessment of hydro development: Case studies from Chamoli District, Uttarakhand, India. Impact Assess Proj Apprais 25: 219-231.
    [69] Delang CO, Toro M (2011) Hydropower-induced displacement and resettlement in the Lao PDR. South East Asia Res 19: 567-594.
    [70] Martinez JJ, Daniel Deng Z, Klopries EM, et al. (2019) Characterization of a siphon turbine to accelerate low-head hydropower deployment. J Cleaner Prod 210: 35-42.
    [71] Vowles AS, Karlsson SP, Uzunova EP, et al. (2014) The importance of behaviour in predicting the impact of a novel small-scale hydropower device on the survival of downstream moving fish. Ecol Eng 69: 151-159.
    [72] Robb Drew (2011) Hydro's fish-friendly turbines. Renewable Energy Focus 12: 16-17.
    [73] Ioannidou C, O'Hanley JR (2018) Eco-friendly location of small hydropower. European J Oper Res 264: 907-918.
    [74] Serpoush B, Khanian M, Shamsai A (2017) Hydropower plant site spotting using geographic information system and a MATLAB based algorithm. J Cleaner Pro 152: 7-16.
    [75] Sangal S, Singhal MK, Saini RP (2018) Hydro-abrasive erosion in hydro turbines: A review. Int J Green Energy 15: 232-253.
    [76] Ueda T, Roberts ES, Norton A, et al. (2019) A life cycle assessment of the construction phase of eleven micro-hydropower installations in the UK. J Cleaner Pro 218: 1-9.
    [77] Thapa BS, Thapa B, Dahlhaug OG (2012) Current research in hydraulic turbines for handling sediments. Energy 47: 62-69.
    [78] Elbatran AH, Yaakob OB, Ahmed YM, et al. (2015) Operation, performance and economic analysis of low head micro-hydropower turbines for rural and remote areas: A review. Renewable Sustainable Energy Rev 43: 40-50.
    [79] Schleicher WC, Riglin JD, Oztekin A (2015) Numerical characterization of a preliminary portable micro-hydrokinetic turbine rotor design. Renewable Energy 76: 234-241.
    [80] Anyi M, Kirke B (2010) Evaluation of small axial flow hydrokinetic turbines for remote communities. Energy Sustainable Dev 14: 110-116.
    [81] Riglin JW, Schleicher C, Oztekin A (2014) Diffuser Optimization for a Micro-Hydrokinetic Turbine. In ASME 2014 International Mechanical Engineering Congress and Exposition. American Society of Mechanical Engineers Digital Collection.
    [82] Dedić-Jandrek H, Nižetić S (2019) Small scale archimedes hydro power plant test station: Design and experimental investigation. J Cleaner Prod 231: 756-771.
    [83] Hosnar J, Kovač-Kralj A (2014) Mathematical modelling and MINLP programming of a hydro system for power generation. J Cleaner Prod 65: 194-201.
    [84] Berrada A, Bouhssine Z, Arechkik A (2019) Optimisation and economic modeling of micro hydropower plant integrated in water distribution system. J Cleaner Prod 232: 877-887.
    [85] Breban S, Nasser M, Ansel A, et al. (2008) Variable speed small hydro power plant connected to AC grid or isolated loads. Epe J 17: 29-36.
    [86] Anagnostopoulos JS, Papantonis DE (2007) Optimal sizing of a run-of-river small hydropower plant. Energy Convers Manage 48: 2663-2670.
    [87] Punys P, Dumbrauskas A, Kvaraciejus A, et al. (2011) Tools for small hydropower plant resource planning and development: A review of technology and applications. Energies 4: 1258-1277.
    [88] Berrada A, Bouhssine Z, Arechkik A (2019) Optimisation and economic modeling of micro hydropower plant integrated in water distribution system. J Cleaner Prod 232: 877-887.
    [89] Sumi T, Okano M, Takata Y (2004) Reservoir sedimentation management with bypass tunnels in Japan. In: Proc. 9th International Symposium on River Sedimentation, 1036-1043.
    [90] Auel C, Boes RM (2011) Sediment bypass tunnel design-review and outlook. Dams and reservoirs under changing challenges 40312. Available from: https://books.google.co.in/books?hl=en&lr=&id=c8PLBQAAQBAJ&oi=fnd&pg=PA403&dq=sediment+bypass+tunnel+small+hydro&ots=WQ4Bv2UhE1&sig=1rVR6dX2MdupAJNNrMjR-kg00IY&redir_esc=y#v=onepage&q=sediment%20bypass%20tunnel%20small%20hydro&f=false.
  • This article has been cited by:

    1. Imlisongla Aier, Abhijeet Anand, Anil Kumar Sakhiya, Priyanka Kaushal, Virendra Kumar Vijay, Modelling approaches to renewable energy sources for rural energy systems in India: a review and case study, 2022, 43, 0143-0750, 7860, 10.1080/01430750.2022.2085792
    2. Alok Bora, Saurabh Awasthi, Nafees Ahamed, 2022, Chapter 10, 978-981-19-0034-1, 117, 10.1007/978-981-19-0035-8_10
    3. Richard Cartland, Al-Mas Sendegeya, Jean de Dieu Khan Hakizimana, Performance Analysis of a Hybrid of Solar Photovoltaic, Genset, and Hydro of a Rural-Based Power Mini-Grid: Case Study of Kisiizi Hydro Power Mini-Grid, Uganda, 2023, 11, 2227-9717, 175, 10.3390/pr11010175
    4. Claude Alain Kouadio, Kouakou Lazare Kouassi, Arona Diedhiou, Salomon Obahoundje, Ernest Amoussou, Bamory Kamagate, Jean-emmanuel Paturel, Talnan Jean Honoré Coulibaly, Houebagnon Saint Jean Patrick Coulibaly, Regis Sacre Didi, Issiaka Savane, Assessing the Hydropower Potential Using Hydrological Models and Geospatial Tools in the White Bandama Watershed (Côte d'Ivoire, West Africa), 2022, 4, 2624-9375, 10.3389/frwa.2022.844934
    5. Pavol Fedor, Daniela Perdukova, Petr Bernat, Libor Stepanec, Viliam Fedak, 2023, Modeling of Electromagnetic Phenomena in Small Hydroelectric Plants, 979-8-3503-2275-0, 1, 10.1109/EDPE58625.2023.10274032
    6. Md. Mustafa Kamal, S. K. Singal, Ali Abbas, Development of correlation for the power coefficient of the hybrid hydrokinetic turbine rotor having straight-bladed Darrieus and helical-bladed Savonius rotors, 2024, 46, 1678-5878, 10.1007/s40430-024-04713-4
    7. Prashant Kumar, S.K. Singal, Pankaj P. Gohil, A technical review on combined effect of cavitation and silt erosion on Francis turbine, 2024, 190, 13640321, 114096, 10.1016/j.rser.2023.114096
    8. Hemi H. Gandhi, Bram Hoex, Brett Jason Hallam, Private Equity Renewable Energy Investments in India, 2024, 24058440, e41098, 10.1016/j.heliyon.2024.e41098
    9. Habtamu Wimego Anore, Tarun Kumar Lohani, Abebe Temesgen Ayalew, Identification of potential hydropower generation sites using geospatial techniques in the Megecha watershed of Ethiopia, 2025, 11, 24058440, e42063, 10.1016/j.heliyon.2025.e42063
  • Reader Comments
  • © 2020 the Author(s), licensee AIMS Press. This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0)
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Metrics

Article views(13362) PDF downloads(983) Cited by(9)

Figures and Tables

Figures(10)  /  Tables(10)

Other Articles By Authors

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return

Catalog