Citation: Kevin Caffrey, Mari Chinn, Matthew Veal, Michael Kay. Biomass supply chain management in North Carolina (part 2): biomass feedstock logistical optimization[J]. AIMS Energy, 2016, 4(2): 280-299. doi: 10.3934/energy.2016.2.280
[1] | Bitian Wu . Day ahead scheduling model of wind power system based on fuzzy stochastic chance constraints—considering source-load dual-side uncertainty case. AIMS Energy, 2025, 13(3): 471-492. doi: 10.3934/energy.2025018 |
[2] | Sameer Thakare, Neeraj Dhanraj Bokde, Andrés E. Feijóo-Lorenzo . Forecasting different dimensions of liquidity in the intraday electricity markets: A review. AIMS Energy, 2023, 11(5): 918-959. doi: 10.3934/energy.2023044 |
[3] | Gerardo Guerra, Juan A. Martinez Velasco . A virtual power plant model for time-driven power flow calculations. AIMS Energy, 2017, 5(6): 887-911. doi: 10.3934/energy.2017.6.887 |
[4] | Vishal Chaudhary, Hari Mohan Dubey, Manjaree Pandit, Surender Reddy Salkuti . A chaotic Jaya algorithm for environmental economic dispatch incorporating wind and solar power. AIMS Energy, 2024, 12(1): 1-30. doi: 10.3934/energy.2024001 |
[5] | Yan Li, Yaheng Su, Qixin Zhao, Bala Wuda, Kaibo Qu, Lei Tang . An electricity price optimization model considering time-of-use and active distribution network efficiency improvements. AIMS Energy, 2025, 13(1): 13-34. doi: 10.3934/energy.2025002 |
[6] | Andrew A. Chien, Fan Yang, Chaojie Zhang . Characterizing curtailed and uneconomic renewable power in the mid-continent independent system operator. AIMS Energy, 2018, 6(2): 376-401. doi: 10.3934/energy.2018.2.376 |
[7] | Gerardo Guerra, Juan A. Martinez-Velasco . Optimal sizing and operation of energy storage systems considering long term assessment. AIMS Energy, 2018, 6(1): 70-96. doi: 10.3934/energy.2018.1.70 |
[8] | V. V. Thang, Thanhtung Ha . Optimal siting and sizing of renewable sources in distribution system planning based on life cycle cost and considering uncertainties. AIMS Energy, 2019, 7(2): 211-226. doi: 10.3934/energy.2019.2.211 |
[9] | Chiara D’Alpaos, Michele Moretto . Do smart grid innovations affect real estate market values?. AIMS Energy, 2019, 7(2): 141-150. doi: 10.3934/energy.2019.2.141 |
[10] | Dalong Guo, Chi Zhou . Potential performance analysis and future trend prediction of electric vehicle with V2G/V2H/V2B capability. AIMS Energy, 2016, 4(2): 331-346. doi: 10.3934/energy.2016.2.331 |
There are many isolated islands in Japan which are not connected to the main grid. The power systems in these islands mainly depend on diesel generators (DGs), which is not economically viable. However, these remote islands are rich in natural resources and have good geographical locations that make them suitable for renewable energy generation. Therefore, renewable energy systems (RESs) such as photovoltaic (PV) and wind generator (WG) systems have been introduced [1,2,3,4,5,6,7,8]. However, generated power by RESs varies according to the time and season as well as the weather conditions such as solar radiatoin and wind speed [9,10,11]. In case where PV and WG are introduced into small power systems, the power systems are affected because the rate of RESs to load demand is relatively large. Also, there are cases wherein the operational plan created on day-ahead cannot work because of forecasting error. In such scenario, the operational plan should be revisited based on new weather information. As a measure against the generated power fluctuation of RESs, battery energy storage system (BESSs) are often utilized. BESSs are very effective system because they allow the generated power fluctuation to be suppressed by charging and discharging [12,13,14,15,16].
Moreover, demand response (DR) programs are attracting much attention these days [17,18,19,20,21,22,23,24,25]. DR programs enable Power Companies to control the load consumption of customers, and they are divided into time-based and incentive-based programs. Several literatures have developed DR models [19,20,21,22]. Furthermore, the effectiveness of DR has been investigated and the benefit it makes to the supply-side by using demand-side resources [22,23,24,25]. However, this paper utilizes real-time pricing (RTP) as a time-based programs to correspond to the fluctuation of powers generated by RESs. RTP encourages customer to increase or reduce the load consumption by varying electricity prices.
With the power system reform in Japan, the power markets transactions are also increasing. In particular, spot (day-ahead) market, intraday hour-ahead market and forward market have been established by the Japan electric power exchange (JEPX). Day-ahead market is wherein power transaction is conducted based on the power generation and demand plan of next day, and hour-ahead market is wherein you adjusts the plan in intraday. In the forward market, the power transaction is performed on fixed price for the relatively far future [26]. These markets make it possible to deal with uncertainty related to the generated power fluctuation [27,28,29,30,31].
This paper presents the optimal operation method coping with the forecasting errors caused by the generated power of the RESs considering the reforecasting and re-planning, the RTP, and two kinds of power markets in multi-area small power systems. The purpose of this research is to indicate the cooperative optimal opration method for a group of isolated small power systems which have RESs and BESS to relieve a economical burden. Furthermore, the process of scheduling the plan that contains RTP and two kinds of power markets is presented, as a measure to cope with uncertainty of renewable energies. The ultimate goal of this study is to reduce the total operational cost for a group of the power systems.Two kinds of power markets are considered for power transactions in three small power systems. The power transactions for the next day are performed in the day-ahead market, and the power transactions in the hour-ahead market are conducted every 3 hours in focused day. However, reforecasing and re-planning are carried out at the same time to reduce forecasting error. Furthermore, the RTP is applied to level the load profiles by varying the electricity prices every hour. The proposed method has achieved to reduce the total operational cost of the multi-area small power systems by using the surplus power obtained through two kinds of power markets effectively even if the forecasting errors of the power generated by RESs and the load demand occur.
The rest of the paper is organized as follows. Section 2 describes the multi-area small power systems model and scenario-based method. The transactions in two mentioned markets and the RTP are discussed in Sections 3 and 4, respectively. In Section 5, the proposed operation method is explained in detail. Section 6 indicates the simulation results and discussion. Finally, conclusion and future work are given in Section 7.
The multi-area small power systems model assumed in this paper is illustrated in Fig. 1. It can be seen that each power system performs a power trading via power markets. Table 1 shows the installed capacity in each power system (PS). Furthermore, Fig. 2 shows the configuration of resources in the power system 1 (PS1) which includes two types of DG, PV, and BESS. The power generated by PV and load profile in PS1 are indicated by solid lines in Figs. 3(b) and 3(c). It is assumed that the hourly prediction data of demand, wind, and irradiance are obtained, and updated every 3 hours. However, uncertainties are considered by using scenario-based method. Fig. 3 shows normal distributions and the load demand and the power generated by PV. The forecasting error increases in proportion to time, and thus, the normal distributions for making scenario are assumed as shown in Fig. 3(a). In Figs. 3(b) and 3(c), the dotted lines represent the scenario examples of the load demand and the power generated by PV.
PS1 | PS2 | PS3 | |
Max Load(MW) | 1.0 | 0.85 | 0.85 |
DG1(0.5MW/unit) | 1 | 1 | 1 |
DG2(0.35MW/unit) | 2 | 1 | 1 |
PV(MW) | 0.5 | 0.5 | 0.5 |
WG(MW) | – | 0.5 | 0.75 |
BESS((0.5MW/5.0MWh)/unit) | 1 | 1 | 1 |
As mentioned earlier, the day-ahead and hour-ahead markets are considered. This paper determines the bidding price and bidding power by using fuzzy inference. Furthermore, the membership function used in bidding is shown on the following equations.
$ SF_{se}=k_{se}P_{dl}~~(P_{dl} \leq 0) $ | (3.1) |
$ CRh_{se}=CRh_{se}+SF_{se} $ | (3.2) |
$ CRl_{se}=CRl_{se}+SF_{se} $ | (3.3) |
$ MS_{se}=\frac{(PR_{ma}-CRl_{se})}{CRh_{se}-CRl_{se}}~~~(CRl_{se} < PR_{ma} \leq CRh_{se}) $ | (3.4) |
where, $SF_{se}$ is shift function for selling; $k_{se}$ is coefficient; $P_{dl}$ is the difference between load demand and generation output (expected surplus power); $CRh_{se}$ is maximum criterion price; $CRl_{se}$ is minimum criterion price; $MS_{se}$ is membership function; $PR_{ma}$ is the trading price. First, the validities obtained from membership function are evaluated as shown in Figs. 4(a) and 4(b) and then, the bidding price and bidding power are determined in Fig. 4(c) by using center-of-gravity method. As a decision criterion for the bidding price and bidding power, the minimum difference between the bidding powers in each PS is employed. Moreover, these equations are:
$ min: \sum\limits_{PS=1}^{3}{P_{bid}^{PS}(t)} $ | (3.5) |
$
PPSdl(t)=kl×(P′PSload(t)−N∑i=1PPSDGi(t))+kBE×MS′PSBE×PPSBE
$
|
(3.6) |
$ P_{bid}^{PS}(t)=MS_{se}^{'PS} \times P_{dl}^{PS}(t) $ | (3.7) |
where $P_{bid}^{PS}(t)$ is the bidding power in $PS$ th power system at time $t$; $P_{dl}^{PS}(t)$ is the difference between load demand and generation output (expected surplus power) in $PS$ th power system at time $t$; $k_{l}$ is the weight for load demand; $P_{load}^{'PS}$ is the difference between load demand and RES output in $PS$ th power system at time $t$; $N$ is the number of DG introduced into power systems; $P_{DGi}^{PS}(t)$ is the output power of the $i$ th DG in $PS$ th power system at time $t$; $k_{BE}$ is the weight for the state of charge (SOC); $MS_{BE}^{'PS}$ is the validity of SOC in $PS$ th power system; $P_{BE}^{PS}$ is the charging and discharging power of BESS in $PS$ th power system at time $t$; $MS_{se}^{'PS}$ is the validity of the expected surplus power.
The sigmoid function is utilized as a demand response model of customer to the electricity price. The load demands are levelized by the RTP shown in Fig. 5 and Eq. (4.1). The equation of demand amount to electricity price is:
$ h_{rtp}(t)=\frac{1}{1+\exp (PR_{rtp}(t)-SF_{1})}+SF_{2} $ | (4.1) |
$ \Delta P_{Load}(t)=h_{rtp}(t) \times \left(P'_{Load}(t)-\frac{\sum\limits_{t=1}^T{P'_{Load}(t)}}{T}\right) \label{response_amount_kWh} $ | (4.2) |
$ P_{RTPLoad}(t)=P_{Load}(t)+\Delta P_{Load}(t) $ | (4.3) |
where, $h_{rtp}(t)$ is the variation rate of load demand at time $t$; $PR_{rtp}(t)$ is the set price at time $t$; $SF_{1}$ is the left-right shift coefficient; $SF_{2}$ is the top-bottom shift coefficient; $\Delta P_{Load}(t)$ is the response amount at time $t$; $P'_{Load}(t)$ is the difference between load demand and RES output at time $t$; $P_{RTPLoad}(t)$ is the difference between load demand and RES output at time $t$ after RTP. The response amounts are determined based on this sigmoid function.
The flow of operational method proposed in this paper is shown in Fig. 6. Planning the operational plan and bidding to the day-ahead market are performed by using the forecasting load in the preceding day. In the forecast day, the reforecasting and re-planning, RTP, and transactions in the hour-ahead market are performed every 3 hour by calculating the shortage and surplus power caused by the forecasting errors.
This section describes the objective function, constraints and optimization method to reduce the total operational cost of multi-power systems.
The objective function is to minimize the total operational cost of multi-power systems in this paper. The start/stop and output plan for the DG, the charging and discharging plan for the BESS, the demand response plan, and interchanging power are determined such that the objective function is minimized. Furthermore, the objective function and the total cost of multi-power systems are given by
$ min~:~TC=\sum\limits_{s=1}^{100}p_s{(TC_{PS1}+TC_{PS2}+TC_{PS3})} $ | (5.1) |
$ TC_{PS}=\sum\limits_{t=1}^{24}[\sum\limits_{i=1}^{N}{\Bigl(F_{i}(t)(P_{DGi}(t))+SU_{i}(t)+SD_{i}(t)\Bigr)}+C_{BESS}+C_{day}(t)+C_{hour}(t)] $ | (5.2) |
where, $p_{s}$ is the probability of error; $s$ is the scinario number; $TC$ is the total cost; $F_{i}(t)(P_{DGi}(t))$ is the fuel cost [Yen] of the $i$ th DG at time $t$; $P_{DGi}(t)$ is the output power [kW] of the $i$ th DG at time $t$; $SU_{i}(t)$ and $SD_{i}(t)$ are the starting and stopping cost [Yen] of the $i$ th DG at time $t$; $C_{BESS}$ is the energy cost [Yen] of BESS used in one day; $C_{day}$ and $C_{hour}$ are trading prices in the day-ahead and hour-ahead markets, respectively.
Furthermore, fuel cost is decided by:
$ F_{i}(P_{DGi})=\frac{Q \times P_{DGi} \times PR_{c}}{Q_{c} \times \eta_{i}} $ | (5.3) |
where, $Q$ is the heat value, it has been considered in this paper by $9~970$ [kJ/kW]; $PR_c$ is the fossil fuel cost which is considered as $90~000$ [Yen/kL]; $Q_c$ is the heat value of fossil fuel (heat value of fossil fuel has taken by $41.9 \times 10^6$ [kJ/kL]); $\eta_{i}(t)$ is the generating efficiency of the $i$ th DG at time $t$.
The total amount of outputs of each DG, the charging and discharging power of BESS and the interchanging power should be equal to load demand at every time as follows:
$ \sum\limits_{i=1}^{N}{P_{DGi}(t)+P_{BESS}(t)+P_{Re}(t)+P_{day}(t)+P_{hour}(t)}=P_{RTPLoad}(t) $ | (5.4) |
where, $P_{Re}(t)$ is the output [kW] of RESs at time $t$; $P_{BESS}(t)$ is the charging and discharging power [kW] of the BESS at time $t$; $P_{day}(t)$ and $P_{hour}(t)$ are the trading power [kW] in the day-ahead and hour-ahead markets, respectively. $P_{Load}(t)$ is the load demand [kW] at time $t$.
The controllable load $P_{RTPLoad}$ after RTP must be within the limit of $P_{Load}^{'min}$ and $P_{Load}^{'max}$ every time as follows:
$ P_{Load}^{'min}(t)\leq P_{RTPLoad}(t)\leq P_{Load}^{'max}(t) $ | (5.5) |
where, $P_{RTPLoad}$ is the modified load demand by RTP [kW]. In addition, $P_{Load}^{'max}$ and $P_{Load}^{'min}$ represent the maximum and minimum load demand [kW], respectively. $P_{Load}^{'min}$ and $P_{Load}^{'max}$ are:
$ P_{Load}^{'max}(t)=P'_{Load}(t)+\frac{P_{rtp}}{P_{RTPLoad}(t)} $ | (5.6) |
$ P_{Load}^{'min}(t)=P'_{Load}(t)-\frac{P_{rtp}}{P_{RTPLoad}(t)} $ | (5.7) |
where, $P_{rtp}$ is the response power [kW]; $P'_{Load}$ is the load demand before RTP [kW]. Furthermore, the load consumption after RTP should be equal to the load consumption before RTP as follows:
$ W_{re}(T)=\left|\int_0^TP_{in}(t)dt-\int_0^TP_{de}(t)dt\right|=0 $ | (5.8) |
where, $W_{re}(T)$ is the controlled load consumption [kW]; $P_{in}(t)$ is the increased load power [kWh]; $P_{de}(t)$ is the decreased load power [kW] as follows:
$ P_{in}(t)=P_{RTPLoad}(t)-P'_{Load}, ~~~(P_{RTPLoad}\geq{P'_{Load}}) $ | (5.9) |
$ P_{de}(t)=P'_{Load}(t)-P_{RTPLoad}, ~~~(P'_{Load}\geq{P_{RTPLoad}}) $ | (5.10) |
The generation output of each DG must be limited within a specified range as follows:
$ P_{DGi}(t) \leq P_{DGi}^{max} $ | (5.11) |
where, $P_{DGi}^{max}$ and the maximum output power [MW] of $DG_{i}$. Furthermore, the spinning reserve must be installed in each DG to cope with load demand fluctuation as follows:
$ P_{DGi}(t)+P_{re i} \leq P_{DGi}^{max} $ | (5.12) |
where, $P_{re i}$ is the spinning resereve [kW] of the $i$ th DG which is considered as 10[%].
The charging and discharging power of BESS need to be within $P_{BESS}^{min}$ and $P_{BESS}^{max}$ as follows:
$ P_{BESS}^{min}\leq P_{BESS}(t) \leq P_{BESS}^{max} $ | (5.13) |
where, $P_{BESS}^{min}$ and $P_{BESS}^{max}$ are the maximum charging power [kW] and maximum discharging power of the BESS. Furthermore, the BESSs can be charged and discharged within the limit ranges of $SOC_{min}$ and $SOC_{max}$ as follows:
$ SOC_{min} \leq SOC(t) \leq SOC_{max} $ | (5.14) |
where, $SOC_{min}$ and $SOC_{max}$ are the minimum and maximum SOC [%] for BESS at time $t$, it is considered by 20% and 80% to cope with the output fluctuated of RESs.
In this paper, the unit commitment for the DG, the charging and discharging plan for the BESS, and the trading power are determined by using this optimization method, Tabu-search. The optimization flowchart is shown in Fig. 7.
STEP1: The forecasting data of the load demand and the power generated by PV and WG are inputted.
STEP2: The unit commitment plans of DGs are determined by the forecasting data in each power system, and then determine the bidding power to the bidding price in day-ahead market by calculating the shortage and surplus power from the determined plan.
STEP3: The contract processing is conducted from the bidding price and power in day-ahead market, and the electricity is traded by determining the contract price and power. In addition, the operational plan is created considering the day-ahead market.
STEP4: The reforecasting and re-planning are conducted, and calculate the shortage and surplus power caused by the forecasting error of the power supply and demand. Furthermore, the bidding power to the bidding price in hour-ahead market is determined by calculating the shortage and surplus power from the determined plan.
STEP5: The operational plan is determined considering the hour-ahead market. Furthermore, if forecasting data is updated, the algorithm proceeds to STEP3, or it ends.
To confirm the effectiveness of the proposed method, this Section makes a comparison between three cases: the operational plan is determined without considering two kinds of power markets and the RTP in Case 1. Case 2 adresses the day-ahead market and RTP, and Case 3 looked at proposed method, the operational plan is determined by considering the reforecasting and re-planning, the day-ahead and hour-ahead markets, and the RTP. In this paper, the operational plan of one day is determined, and it is assumed that forecasting data is updated every 3 hour. Furthermore, the uncertainty regarding the power supply-demand is considered by applying scenario-based method and using 100 kinds of scenarios with respect to the load demand and the output of RESs. Three cases are operated in each scenario, and the method for confirming the effectiveness is to calculate the expectation value of the operational cost.
The simulation results of three cases are illustrated in Figs. 8, 9 and 10, respectively. It can be seen from Fig. 8 that the number of starts and stops of the DGs in PS2 are many at morning, while that of in PS3 are many at night. This is because the DGs are required to start and stop to cope with forecasting error of the load demand and power generated by RESs. In particular, the SOC reaches 80% after 16:00 in the PS3 because the surplus power occurred in large amount caused by the forecasting error. Therefore, the DGs start and stop frequently because the BESS cannot charge. From Figs. 9 and 11(a), PS1 is obtained profit by selling electricity in day-ahead market. In PS2 and PS3, they meet the load demands in the forenoon by buying electricity in day-ahead market and charging and discharging of the BESSs. The results show that day-ahead market brings about reduction in the number of starts and stops of the DGs. At night, DG in PS3 unavoidably stopped because BESS cannot charge. Furthermore, in PS2 and PS3 in case 3, the forecasting errors of the load demand and the renewable energies are compensated by interchanging electricity through two kinds of power markets and RTP as shown in Figs. 9 and 11(b). It is clear from Figs. 8, 9 and 10 that the number of starts and stops of the DGs in proposed method is less than that of the DGs in Case 1 and Case 2. Fig. 12 shows the simulation results of RTP. The load demand is decreased when the electricity price is expensive, while it is increased when the electricity price is low as shown in Fig. 12. Thereby, it is accomplished to level the load demands in each PS. The expected values of the Fuel and operational costs in each case are listed in Table 2. It can be seen that the value of the proposed method has the lowest cost of three cases. Thus, the high-efficiency operation has been achieved, even when the forecasting error occur.
Case 1 | Case 2 | Case 3 | |
RTP | without | with | with |
Day-ahead market | without | with | with |
Hour-ahead market | without | without | with |
Fuel cost [Yen] | 2,810,100 | 2,168,100 | 1,738,900 |
(100%) | (77.2%) | (61.9%) | |
Operational cost [Yen] | 2,937,047 | 2,294,047 | 1,865,847 |
(100%) | (78.1%) | (63.5%) |
In recent year, RES and BESS have been introducing into the power systems in isolated small islands in Japan because of its low economic cost as compared to DGs. However, the problem of uncertainty of renewable energies has a bad effect on the power systems, especially in the case of the small systems. therefore, as countermeasures towards the above problem, the process of creating the effective operational plan for RTP, power trading at the markets, and the unit commitment of DGs has been explained in this paper. Furthermore, the uncertainty of renewable energies is faithfully modeled in simulation by taking into account that forecast errors are increased in proportion to the time.
This paper focuses on determining the optimal operation plan capable of coping with uncertainty regarding the power supply-demand by considering the reforecasting and re-planning, the day-ahead and hour-ahead markets, and RTP. By applying RTP, it was able to create the operational plan which can cope with the output variation of RESs by using the DR ability of customers, and to effectively use energies. The power markets enable to transact the shortage and surplus power caused by the output variations of RESs with neighborhood islands. Furthermore, the optimal amount of trading power were determined by fuzzy inference in this paper. The proposed method utilized renewable energies effectively by suppressing the surplus and shortage powers caused by a forecasting error. Fortunately the proposed method was able to reduce the total operational cost of the multi-area small power systems even if the forecasting errors relating the power supply-demand occurred.
In this work, the optimum installed capacity of DGs, RESs and BESSs are not considered. However, optimum installed capacity is required to be considered for coping with uncertainty regarding the power supply-demand with increase in RESs. Thus, this study can be extended into the optimal operation method considering the optimum installed capacity of each system for the future research.
All authors declare on conflicts of interst in this paper.
[1] | US EPA (2011) Biofuels and the Environment: First Triennial Report to Congress. United States Environmental Protection Agency, National Center for Environmental Assessment, Office of Research and Development. EPA/600/R-10/183F. |
[2] | US Cong (2007) Energy Independence and Security Act of 2007. 100th Congress, 1st session HR 6.4. |
[3] | US DOE (2011) US Billion Ton Update: Biomass Supply for a Bioenergy and Bioproducts Industry. Leads: RD Perlack and BJ Stokes. United States Department of Energy, Oak Ridge National Laboratory. ORNL/TM-2011/224. |
[4] | US DOE (2005) Biomass as Feedstock for a Bioenergy and Bioproducts Industry: The Technical Feasibility of a Billion Ton Annual Supply. Leads: RD Perlack, BJ Stokes, and DC Erbach. United States Department of Energy, Oak Ridge National Laboratory ORNL/TM-2005/66. |
[5] | BR & DB (2008) National Biofuels Action Plan October 2008. Biomass Research and Development Board, Biomass Research and Development Initiative. |
[6] |
Haldi J, David W (1967) Economies of Scale in Industrial Plants. J polit econ 75: 373-385. doi: 10.1086/259293
![]() |
[7] | US DOE (2002) Lignocellulosic Biomass to Ethanol Process Design and Economics Utilizing Co-Current Dilute Acid Prehydrolysis and Enzymatic Hydrolysis for Corn Stover. A Aden, M Ruth, K Ibsen, et al., United States Department of Energy, National Renewable Energy Laboratory, NREL/TP-510-32438. |
[8] |
Resop JP, Cundiff JS, Heatwole CD (2011) Spatial analysis of site satellite storage locations for herbaceous biomass in the piedmont of the southeast. Appl eng agric 27: 25-32. doi: 10.13031/2013.36221
![]() |
[9] | Judd JD, Sarin SC, Cundiff JS (2012) Design, Modeling and Analysis of a Feedstock Logistics System. Bioresource Technol 103: 209-218. |
[10] | Kumar A, Sokhansanj S (2007) Switchgrass (Panicum virgatum, L.) delivery to a biorefinery using integrated biomass supply analysis and logistics (IBSAL) model. Bioresource Technol 98: 1033-1044. |
[11] |
Worley JS, Cundiff JS (1991) System analysis of sweet sorghum harvest for ethanol production in the piedmont. Transactions of the ASAE 34: 539-547. doi: 10.13031/2013.31697
![]() |
[12] | US DOE (2009) Commodity-Scale Production of an Infrastructure-Compatible Bulk Solid from Herbaceous Lignocellulosic Biomass: Uniform-Format Bioenergy Feedstock Supply System Design Report Series. Hess JR, Kenney KL, Ovard LP, et al. United States Department of Energy, National Renewable Energy Laboratory. INL/EXT-09-17527. |
[13] |
Shastri Y, Hansen A, Rodriguez L, et al. (2011) Development and application of BioFeed model for optimization of herbaceous feedstock production. Biomass Bioenerg 35: 2961-2974. doi: 10.1016/j.biombioe.2011.03.035
![]() |
[14] | Shastri YN, Rodriguez LF, Hansen AC, et al. (2012) Impact of distributed storage and pre-processing on Miscanthus production and provision systems. Biofuel Bioprod Bior 6: 21-31. |
[15] |
Ravula PP, Grisso RD, Cundiff JS (2008) Cotton logistics as a model for a biomass transportation system. Biomass Bioenerg 32: 314-325. doi: 10.1016/j.biombioe.2007.10.016
![]() |
[16] | Cundiff JS, Grisso RD, Ravula PP (2004) Management for Biomass Delivery at a Conversion Plant. 2004 American Society of Agricultural Engineers and Canadian Society of Agricultural Engineers Annual International Meeting August 1-4, 2004 Ottawa, Ontario. |
[17] | Cundiff JS, Grisso RD (2008) Containerized Handling to Minimize Hauling Cost of Herbaceous Biomass. Biomass Bioenerg 32: 308-313. |
[18] | An H, Willhelm WE, Searcy SW (2011) A mathematical model to design a lignocellulosic biofuel supply chain system with a case study based on a region in Central Texas. Bioresource Technol 102: 7860-7870. |
[19] | Kay, MG (2014) Matlog: Logistics engineering Matlab toolbox. North Carolina State University, Fitts Department of Industrial and Systems Engineering. Available from: http://www.ise.ncsu.edu/kay/matlog/ |
[20] | Caffrey KR, Chinn MS, Veal MW (2015). Biomass supply chain management in North Carolina (part 1): predictive model for cropland conversion to biomass feedstocks. AIMS Energy 4: 256-279. |
[21] | Hughes SR, Gibbons WR, Moser BR, et al., (2013) Sustainable Multipurpose Biorefineries for Third-Generation Biofuels and Value-Added Co-Products. InTech. Available from: www.intechopen.com |
[22] | Saxe C (2004) Big Bale Storage Losses. University of Wisconsin Extension, November 2004. |
[23] | Lazarus WF (2009) Machinery Cost Estimates. University of Minnesota Extension. September 2014. |
[24] | Lazarus WF (2014) Machinery Cost Estimates. University of Minnesota Extension. June 2014. |
[25] | USDA (2015) Cash Rents by County. United States Department of Agriculture, National Agricultural Statistics Service. August 2014. Available at: www.nass.usda.gov |
[26] | Atkinson AD, Rich BA, Tungate KD, et al. (2006) North Carolina Canola Production. North Carolina State University, North Carolina Solar Center & College of Agricultural and Life Sciences. SJS/KEL-9/06-W07. |
[27] |
Xiao R, Cai Z, Zhang X (2012) A production optimization model of supply-driven chain quality uncertainty. J Syst Sci Systems Eng 21: 144-160. doi: 10.1007/s11518-011-5184-8
![]() |
[28] |
Benson GA, Green JT (2013) Corn Silage 2013. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[29] |
Hwang S, Epplin FM, Lee BH, et al. (2009) A probabilistic estimate of the frequency of mowing and baling days available in Oklahoma USA for the harvest of switchgrass for use in biorefineries. Biomass Bioenerg 33: 1037-1045. doi: 10.1016/j.biombioe.2009.03.003
![]() |
[30] | Crouse D (2003) Realistic yields and nitrogen application factors for North Carolina crops. http://nutrients.soil.ncsu.edu/yields/ North Carolina State University, North Carolina Department of Agriculture and Consumer Services, North Carolina Department of Environment and Natural Resources, Natural Resources Conservation Service. Raleigh NC |
[31] | USDA (2014) Cropland Data Layer 2013. Published crop-specific data layer [online]. United States Department of Agriculture, National Agricultural Statistics Service. Available from: http://nassgeodata.gmu.edu/CropScape. Accessed: July 2014. |
[32] | Bullen G, Weddington E (2012) Enterprise Budgets: Corn- Conventional Till-NC, Coastal Plain 2012. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[33] | Bullen G, Weddington E (2012). Enterprise Budgets: Corn- No Till-NC, Coastal Plain 2012. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[34] | NCSU (2014) Enterprise Budget: No-Till Grain Sorghum for the Coastal Plain Region of NC. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[35] | Bullen G, Dunphy J (2012). Enterprise Budgets: Soybeans- Full Season, Conventional Tillage 2012. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[36] | Bullen G, Dunphy J (2012) Enterprise Budgets: Soybeans- Full Season, No Till 2012. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[37] | Bullen G, Weddington E (2012) Enterprise Budgets: Wheat for Grain Conventional 2012. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[38] | Bullen G, Weddington E (2012) Enterprise Budgets: Wheat for Grain No-Till 2012. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[39] |
Green JT, Benson GA (2013) Bermuda Grass for Pasture. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[40] |
Green JT, Benson GA (2013) Bermuda Grass for Hay. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[41] |
Green JT, Benson GA (2013) Cool Season Perennial Grass for Pasture. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[42] |
Green JT, Benson GA (2013) Hay Harvest Cost, Large Round Baler. North Carolina State University, Department of Agricultural and Resource Economics. Available from: http://ag-econ.ncsu.edu/extension/budgets. |
[43] | Cooper L (1964) Heuristic Method for Location-Allocation Problems. SIAM Review 6: 36-53. |
[44] |
US BOC (2014) Topologically Integrated Geographic Encoding and Referencing 2010. United States Bureau of the Census. Available from: https://www.census.gov/geo/maps-data/data/tiger.html |
[45] |
US DOI (2014) National Land Cover Database 2011. United States Department of the Interior, Multi-Resolution Land Characteristics Consortium (MRLC). Available from: http://www.mrlc.gov/nlcd2011.php |
[46] | Love R, Morris J, Wesolowsky G (1988) Facilities Location: Models and Methods, New York: North-Holland. |
PS1 | PS2 | PS3 | |
Max Load(MW) | 1.0 | 0.85 | 0.85 |
DG1(0.5MW/unit) | 1 | 1 | 1 |
DG2(0.35MW/unit) | 2 | 1 | 1 |
PV(MW) | 0.5 | 0.5 | 0.5 |
WG(MW) | – | 0.5 | 0.75 |
BESS((0.5MW/5.0MWh)/unit) | 1 | 1 | 1 |
Case 1 | Case 2 | Case 3 | |
RTP | without | with | with |
Day-ahead market | without | with | with |
Hour-ahead market | without | without | with |
Fuel cost [Yen] | 2,810,100 | 2,168,100 | 1,738,900 |
(100%) | (77.2%) | (61.9%) | |
Operational cost [Yen] | 2,937,047 | 2,294,047 | 1,865,847 |
(100%) | (78.1%) | (63.5%) |
PS1 | PS2 | PS3 | |
Max Load(MW) | 1.0 | 0.85 | 0.85 |
DG1(0.5MW/unit) | 1 | 1 | 1 |
DG2(0.35MW/unit) | 2 | 1 | 1 |
PV(MW) | 0.5 | 0.5 | 0.5 |
WG(MW) | – | 0.5 | 0.75 |
BESS((0.5MW/5.0MWh)/unit) | 1 | 1 | 1 |
Case 1 | Case 2 | Case 3 | |
RTP | without | with | with |
Day-ahead market | without | with | with |
Hour-ahead market | without | without | with |
Fuel cost [Yen] | 2,810,100 | 2,168,100 | 1,738,900 |
(100%) | (77.2%) | (61.9%) | |
Operational cost [Yen] | 2,937,047 | 2,294,047 | 1,865,847 |
(100%) | (78.1%) | (63.5%) |