Computer-based analysis for design and schedule management for commercial buildings

  • Published: 06 February 2023
  • Civilization in a country is measured by the growing number of urban cities. More than 50% of the global population stays in cities, and, in some other countries, it even reaches up to 80%. In India, the percentage is 35% live in urban areas, and it has been increasing rapidly over the years. At present, most of the construction projects in India are experiencing project delays and cost overruns. The main reason for this is that construction activities are implemented without proper scheduling, planning, and execution. The project progress time is required a proper timetable for more efficient execution. Scheduling aids in delivering the project more efficiently through the use of techniques like bar charts and the critical path method (CPM) to visualize the activities of the project. Bar charts could also be applied as a selective booking tool for arranging, but they should be subsequently supplemented by a rationale-based method like the CPM. Primavera is a project management software tool that makes use of this CPM logic to schedule the project and allocate resources. This paper analyzes the application of project management software in the ongoing construction project of a commercial building that is using a conventional method. As a part of our research, the activities and operations of the project were recorded and monitored on a daily basis through the use of Primavera. The consequences of delays in the project were forecasted by using software, and the resources were sequenced for utilization accordingly. This process in turn facilitates the optimization of resources and completion of the project as per the schedule. The results of the study can be applied to any construction project for the sustainable utilization of resources. This study entailed ongoing construction project monitoring and recording of the operational activities through the use of Primavera software to facilitate the sustainable management of resources. By using this technology, the resources can be utilized in a sustainable manner as per the schedule. Similar projects of the same size and budget can thus achieve better results.

    Citation: Prakeerth Anam, B. Madhusudhana Rao, SS. Asadi. Computer-based analysis for design and schedule management for commercial buildings[J]. Urban Resilience and Sustainability, 2023, 1(1): 37-47. doi: 10.3934/urs.2023003

    Related Papers:

  • Civilization in a country is measured by the growing number of urban cities. More than 50% of the global population stays in cities, and, in some other countries, it even reaches up to 80%. In India, the percentage is 35% live in urban areas, and it has been increasing rapidly over the years. At present, most of the construction projects in India are experiencing project delays and cost overruns. The main reason for this is that construction activities are implemented without proper scheduling, planning, and execution. The project progress time is required a proper timetable for more efficient execution. Scheduling aids in delivering the project more efficiently through the use of techniques like bar charts and the critical path method (CPM) to visualize the activities of the project. Bar charts could also be applied as a selective booking tool for arranging, but they should be subsequently supplemented by a rationale-based method like the CPM. Primavera is a project management software tool that makes use of this CPM logic to schedule the project and allocate resources. This paper analyzes the application of project management software in the ongoing construction project of a commercial building that is using a conventional method. As a part of our research, the activities and operations of the project were recorded and monitored on a daily basis through the use of Primavera. The consequences of delays in the project were forecasted by using software, and the resources were sequenced for utilization accordingly. This process in turn facilitates the optimization of resources and completion of the project as per the schedule. The results of the study can be applied to any construction project for the sustainable utilization of resources. This study entailed ongoing construction project monitoring and recording of the operational activities through the use of Primavera software to facilitate the sustainable management of resources. By using this technology, the resources can be utilized in a sustainable manner as per the schedule. Similar projects of the same size and budget can thus achieve better results.



    加载中


    [1] Chitkara KK (2009) Construction project management: planning, scheduling and controlling, Gautam Buddha Nagar: Tata McGraw-Hill Edition, 118–140.
    [2] Kannan KS, Kumar MGR (2019) Planning and scheduling residential building using Primavera software. MAT J Transport Syst 4: 10–14. https://doi.org/10.5281/zenodo.2632662 doi: 10.5281/zenodo.2632662
    [3] Ovsiannikova T, Nikolaenko M (2017) Sustainable urban built environment: modern management concepts and evaluation methods. AIP Conf Proc 1800: 050002. https://doi.org/10.1063/1.4973062 doi: 10.1063/1.4973062
    [4] James PL (2001) Project Planning, Scheduling and Control: A Hands-On Guide to Bringing Projects In On Time and On Budget, Gautam Buddha Nagar: Tata McGraw-Hill Edition, 48–75.
    [5] Wali KI, Othman SA (2019) Comparison and assessment of using Primavera and microsoft project in construction projects in Erbil City. Zanco J Pure Appl Sci 31: 285–291. https://doi.org/10.21271/zjpas.31.s3.39 doi: 10.21271/zjpas.31.s3.39
    [6] Alla S, Asadi SS (2022) Investigation on fluidity, microstructure, mechanical and durability properties of snail shell-based graphene oxide cement composite material. Asian J Civ Eng 7: 1–14. https://doi.org/10.1016/j.conbuildmat.2022.129767 doi: 10.1016/j.conbuildmat.2022.129767
    [7] Kowshik K, Kumar SS, Asadi SS (2020) Design and development of resources management information system for construction projects. J Re Lepid 51: 42–53. https://doi.org/10.36872/lepi/v51i3/301168 doi: 10.36872/lepi/v51i3/301168
    [8] Alla S, Asadi SS (2022) Experimental investigation and microstructural behavior of un-calcined and calcined snail shell powder cement mortar. J Build Rehabil 7: 1–14. https://doi.org/10.1007/s41024-022-00183-0 doi: 10.1007/s41024-022-00183-0
    [9] Dutta S, Bardhan S, Bhaduri S (2013) Urban environment studies for a sustainable future: an alternative approach. ABACUS 8: 38–49.
    [10] Subramani T, Sarkunam A, Jayalakshmi J (2014) Planning and scheduling of high rise building using Primavera. Int J Eng Res App 4: 134–144.
    [11] Suresh B, Kumar D, Asadi SS (2020) An empirical study of customers towards the online advertisements. Test Eng Manage 883: 7044–7058.
  • Reader Comments
  • © 2023 the Author(s), licensee AIMS Press. This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0)
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Metrics

Article views(1982) PDF downloads(42) Cited by(0)

Article outline

Figures and Tables

Figures(8)  /  Tables(1)

Other Articles By Authors

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return

Catalog