High-mix low-volume manufacturing requires production readiness under uncertain orders and limited capacity. We formulate a two-stage stochastic model that selects product–machine readiness before demand and then jointly accepts and schedules orders with alternative machines, sequence-dependent setups, and deadlines. We establish complexity and structural results and develop exact component-wise logic-based Benders decomposition and a capability-aware matheuristic. In the focal study, 20 sample average approximation replications select the same network; the stochastic design achieves out-of-sample net value 145.89 versus 65.29 for a deterministic-medoid benchmark. Component-wise decomposition reduces master iterations from 47 to 20. Across 48 additional instances, the schedule-aware heuristic improves mean net value by 28.99 over an aggregate proxy (95% paired interval [14.89, 43.09]). However, a small-instance exact-recourse check finds a ranking reversal, so heuristic gains do not establish exact-policy superiority.
Citation: Youngchul Kim, Chaehwa Lee, Hyeyoung Hwang, Jinho Cha, Hongsuk Park. Stochastic production-readiness design and order-acceptance scheduling in high-mix low-volume manufacturing[J]. Journal of Industrial and Management Optimization, 2026, 22(12): 6867-6907. doi: 10.3934/jimo.2026229
High-mix low-volume manufacturing requires production readiness under uncertain orders and limited capacity. We formulate a two-stage stochastic model that selects product–machine readiness before demand and then jointly accepts and schedules orders with alternative machines, sequence-dependent setups, and deadlines. We establish complexity and structural results and develop exact component-wise logic-based Benders decomposition and a capability-aware matheuristic. In the focal study, 20 sample average approximation replications select the same network; the stochastic design achieves out-of-sample net value 145.89 versus 65.29 for a deterministic-medoid benchmark. Component-wise decomposition reduces master iterations from 47 to 20. Across 48 additional instances, the schedule-aware heuristic improves mean net value by 28.99 over an aggregate proxy (95% paired interval [14.89, 43.09]). However, a small-instance exact-recourse check finds a ranking reversal, so heuristic gains do not establish exact-policy superiority.
| [1] |
S. Dauzère-Pérès, J. Ding, L. Shen, K. Tamssaouet, The Flexible Job Shop Scheduling Problem: A Review, Eur. J. Oper. Res., 314 (2024), 409–432. https://doi.org/10.1016/j.ejor.2023.05.017 doi: 10.1016/j.ejor.2023.05.017
|
| [2] |
C. Özgüven, L. Özbakır, Y. Yavuz, Mathematical Models for Job-Shop Scheduling Problems with Routing and Process Plan Flexibility, Appl. Math. Model., 34 (2010), 1539–1548. https://doi.org/10.1016/j.apm.2009.09.002 doi: 10.1016/j.apm.2009.09.002
|
| [3] |
S. A. Slotnick, Order Acceptance and Scheduling: A Taxonomy and Review, Eur. J. Oper. Res., 212 (2011), 1–11. https://doi.org/10.1016/j.ejor.2010.09.042 doi: 10.1016/j.ejor.2010.09.042
|
| [4] |
L. Xu, Q. Wang, S. Huang, Dynamic Order Acceptance and Scheduling Problem with Sequence-Dependent Setup Time, Int. J. Prod. Res., 53 (2015), 5797–5808. https://doi.org/10.1080/00207543.2015.1005768 doi: 10.1080/00207543.2015.1005768
|
| [5] |
Q. Li, D. Zhang, S. Wang, I. Kucukkoc, A Dynamic Order Acceptance and Scheduling Approach for Additive Manufacturing On-Demand Production, Int. J. Adv. Manuf. Technol., 105 (2019), 3711–3729. https://doi.org/10.1007/s00170-019-03796-x doi: 10.1007/s00170-019-03796-x
|
| [6] |
M. Fu, R. G. Askin, J. W. Fowler, M. Zhang, Stochastic Optimization of Product–Machine Qualification in a Semiconductor Back-End Facility, IIE Trans., 47 (2015), 739–750. https://doi.org/10.1080/0740817X.2014.964887 doi: 10.1080/0740817X.2014.964887
|
| [7] |
X. Chang, M. Dong, Stochastic Programming for Qualification Management of Parallel Machines in Semiconductor Manufacturing, Comput. Oper. Res., 79 (2017), 49–59. https://doi.org/10.1016/j.cor.2016.09.006 doi: 10.1016/j.cor.2016.09.006
|
| [8] |
H. Li, W. T. Huh, M. C. Sampaio, N. Keng, Planning Production and Equipment Qualification under High Process Flexibility, Prod. Oper. Manag., 30 (2021), 3369–3390. https://doi.org/10.1111/poms.13439 doi: 10.1111/poms.13439
|
| [9] |
T. Aouam, K. Geryl, K. Kumar, N. Brahimi, Production Planning with Order Acceptance and Demand Uncertainty, Comput. Oper. Res., 91 (2018), 145–159. https://doi.org/10.1016/j.cor.2017.11.013 doi: 10.1016/j.cor.2017.11.013
|
| [10] |
F. Xiong, L. Jing, C. Xiang, Y. Han, Order Acceptance and Scheduling under Eligibility, Availability, and Budget Constraints in Distributed Heterogeneous Flow Shop Production, Expert Syst. Appl., 280 (2025), 127586. https://doi.org/10.1016/j.eswa.2025.127586 doi: 10.1016/j.eswa.2025.127586
|
| [11] |
F. Tanrisever, D. J. Morrice, D. P. Morton, Managing Capacity Flexibility in Make-to-Order Production Environments, Eur. J. Oper. Res., 216 (2012), 334–345. https://doi.org/10.1016/j.ejor.2011.07.043 doi: 10.1016/j.ejor.2011.07.043
|
| [12] |
W. C. Jordan, S. C. Graves, Principles on the Benefits of Manufacturing Process Flexibility, Manag. Sci., 41 (1995), 577–594. https://doi.org/10.1287/mnsc.41.4.577 doi: 10.1287/mnsc.41.4.577
|
| [13] |
D. Simchi-Levi, Y. Wei, Understanding the Performance of the Long Chain and Sparse Designs in Process Flexibility, Oper. Res., 60 (2012), 1125–1141. https://doi.org/10.1287/opre.1120.1081 doi: 10.1287/opre.1120.1081
|
| [14] |
G. Zhang, J. Sun, X. Liu, G. Wang, Y. Yang, Solving Flexible Job Shop Scheduling Problems with Transportation Time Based on Improved Genetic Algorithm, Math. Biosci. Eng., 16 (2019), 1334–1347. https://doi.org/10.3934/mbe.2019065 doi: 10.3934/mbe.2019065
|
| [15] |
S. Yan, G. Zhang, J. Sun, W. Zhang, An Improved Ant Colony Optimization for Solving the Flexible Job Shop Scheduling Problem with Multiple Time Constraints, Math. Biosci. Eng., 20 (2023), 7519–7547. https://doi.org/10.3934/mbe.2023325 doi: 10.3934/mbe.2023325
|
| [16] |
Y. Chen, H. Wang, C. Tsai, C. Wu, A Genetic Algorithm for Tool-Constrained Scheduling with Dynamic Expedited Orders in Smart Manufacturing, J. Ind. Manag. Optim., 22 (2026), 182–213. https://doi.org/10.3934/jimo.2026007 doi: 10.3934/jimo.2026007
|
| [17] |
J. C. Chen, C. Wu, C. Chen, K. Chen, Flexible Job Shop Scheduling with Parallel Machines Using Genetic Algorithm and Grouping Genetic Algorithm, Expert Syst. Appl., 39 (2012), 10016–10021. https://doi.org/10.1016/j.eswa.2012.01.211 doi: 10.1016/j.eswa.2012.01.211
|
| [18] |
M. Rowshannahad, S. Dauzère-Pérès, B. Cassini, Capacitated Qualification Management in Semiconductor Manufacturing, Omega, 54 (2015), 50–59. https://doi.org/10.1016/j.omega.2015.01.012 doi: 10.1016/j.omega.2015.01.012
|
| [19] |
A. Perraudat, S. Dauzère-Pérès, P. Vialletelle, Robust Tactical Qualification Decisions in Flexible Manufacturing Systems, Omega, 106 (2022), 102537. https://doi.org/10.1016/j.omega.2021.102537 doi: 10.1016/j.omega.2021.102537
|
| [20] |
A. Perraudat, S. Dauzère-Pérès, P. Vialletelle, Optimizing Multiple Qualifications of Products on Non-Identical Parallel Machines, Comput. Oper. Res., 144 (2022), 105813. https://doi.org/10.1016/j.cor.2022.105813 doi: 10.1016/j.cor.2022.105813
|
| [21] |
J. Feng, H. Li, W. T. Huh, M. C. Sampaio, N. Keng, Erratum for "Planning Production and Equipment Qualification under High Process Flexibility", Prod. Oper. Manag., 31 (2022), 1890–1892. https://doi.org/10.1111/poms.13682 doi: 10.1111/poms.13682
|
| [22] |
K. Tamssaouet, S. Dauzère-Pérès, On the Impact of Operation Flexibility in the Flexible Job-Shop Scheduling Problem, Omega, 144 (2026), 103591. https://doi.org/10.1016/j.omega.2026.103591 doi: 10.1016/j.omega.2026.103591
|
| [23] |
M. Nattaf, S. Dauzère-Pérès, C. Yugma, C. Wu, Parallel Machine Scheduling with Time Constraints on Machine Qualifications, Comput. Oper. Res., 107 (2019), 61–76. https://doi.org/10.1016/j.cor.2019.03.004 doi: 10.1016/j.cor.2019.03.004
|
| [24] |
X. Chang, M. Dong, Product–Machine Qualification Using a Process Flexibility Strategy Considering Capacity Loss, IISE Trans., 56 (2024), 98–113. https://doi.org/10.1080/24725854.2023.2202226 doi: 10.1080/24725854.2023.2202226
|
| [25] |
J. Chen, X. Ye, W. Ma, D. Xu, Logic-Based Benders Decomposition for Order Acceptance and Scheduling on Heterogeneous Factories with Carbon Caps, Comput. Oper. Res., 168 (2024), 106706. https://doi.org/10.1016/j.cor.2024.106706 doi: 10.1016/j.cor.2024.106706
|
| [26] |
J. Chen, X. Ye, N. Xie, Y. Sang, M. Sterna, Benders Decompositions for Order Acceptance and Scheduling in Additive Manufacturing, Eur. J. Oper. Res., 330 (2026), 745–759. https://doi.org/10.1016/j.ejor.2025.10.005 doi: 10.1016/j.ejor.2025.10.005
|
| [27] |
C. Zheng, J. Yu, G. Wan, Online order acceptance and scheduling in a single machine environment, Comput. Oper. Res., 179 (2025), 107028. https://doi.org/10.1016/j.cor.2025.107028 doi: 10.1016/j.cor.2025.107028
|
| [28] |
B. Ervural, A. Özaydın, Integrated order acceptance and inventory policy optimization in a multi-period, multi-product hybrid production system, Oper. Res. Perspect., 13 (2024), 100318. https://doi.org/10.1016/j.orp.2024.100318 doi: 10.1016/j.orp.2024.100318
|
| [29] |
G. Xu, N. Wu, Y. Qiao, S. Zhang, Exact approach to joint order acceptance and non-permutation flow shop scheduling via logic-based Benders decomposition, Int. J. Prod. Res., (2026), 1–27. https://doi.org/10.1080/00207543.2026.2739603 |
| [30] |
T. Aouam, N. Brahimi, Integrated Production Planning and Order Acceptance under Uncertainty: A Robust Optimization Approach, Eur. J. Oper. Res., 228 (2013), 504–515. https://doi.org/10.1016/j.ejor.2013.02.010 doi: 10.1016/j.ejor.2013.02.010
|
| [31] |
Y. Boulaksil, M. Grunow, J. C. Fransoo, Capacity Flexibility Allocation in an Outsourced Supply Chain with Reservation, Int. J. Prod. Econ., 129 (2011), 111–118. https://doi.org/10.1016/j.ijpe.2010.09.010 doi: 10.1016/j.ijpe.2010.09.010
|
| [32] |
E. K. Bish, A. Muriel, S. Biller, Managing Flexible Capacity in a Make-to-Order Environment, Manag. Sci., 51 (2005), 167–180. https://doi.org/10.1287/mnsc.1040.0322 doi: 10.1287/mnsc.1040.0322
|
| [33] |
A. A. Syntetos, M. Z. Babai, N. Altay, On the Demand Distributions of Spare Parts, Int. J. Prod. Res., 50 (2012), 2101–2117. https://doi.org/10.1080/00207543.2011.562561 doi: 10.1080/00207543.2011.562561
|
| [34] |
S. Moon, C. Hicks, A. Simpson, The Development of a Hierarchical Forecasting Method for Predicting Spare Parts Demand in the South Korean Navy–-A Case Study, Int. J. Prod. Econ., 140 (2012), 794–802. https://doi.org/10.1016/j.ijpe.2012.02.012 doi: 10.1016/j.ijpe.2012.02.012
|
| [35] |
S. Moon, A. Simpson, C. Hicks, The Development of a Classification Model for Predicting the Performance of Forecasting Methods for Naval Spare Parts Demand, Int. J. Prod. Econ., 143 (2013), 449–454. https://doi.org/10.1016/j.ijpe.2012.02.016 doi: 10.1016/j.ijpe.2012.02.016
|
| [36] |
L. Berterottière, S. Dauzère-Pérès, C. Yugma, Flexible Job-Shop Scheduling with Transportation Resources, Eur. J. Oper. Res., 312 (2024), 890–909. https://doi.org/10.1016/j.ejor.2023.07.036 doi: 10.1016/j.ejor.2023.07.036
|
| [37] |
Y. Dong, S. Jiang, L. Zhou, Z. Jiang, Y. Yu, A Joint Scheduling Approach for Production and Material Handling under Customized Manufacturing Paradigm, Eur. J. Oper. Res., 332 (2026), 730–747. https://doi.org/10.1016/j.ejor.2026.01.022 doi: 10.1016/j.ejor.2026.01.022
|
| [38] |
J. N. Hooker, Planning and Scheduling by Logic-Based Benders Decomposition, Oper. Res., 55 (2007), 588–602. https://doi.org/10.1287/opre.1060.0371 doi: 10.1287/opre.1060.0371
|
| [39] |
Özgün Elçi, J. N. Hooker, Stochastic Planning and Scheduling with Logic-Based Benders Decomposition, INFORMS J. Comput., 34 (2022), 2428–2442. https://doi.org/10.1287/ijoc.2022.1184 doi: 10.1287/ijoc.2022.1184
|
| [40] |
G. Codato, M. Fischetti, Combinatorial Benders' Cuts for Mixed-Integer Linear Programming, Oper. Res., 54 (2006), 756–766. https://doi.org/10.1287/opre.1060.0286 doi: 10.1287/opre.1060.0286
|
| [41] |
A. H. C. Eaves, B. G. Kingsman, Forecasting for the Ordering and Stock-Holding of Spare Parts, J. Oper. Res. Soc., 55 (2004), 431–437. https://doi.org/10.1057/palgrave.jors.2601697 doi: 10.1057/palgrave.jors.2601697
|
| [42] |
Z. Gu, G. L. Nemhauser, M. W. P. Savelsbergh, Lifted Cover Inequalities for 0-1 Integer Programs: Computation, INFORMS J. Comput., 10 (1998), 427–437. https://doi.org/10.1287/ijoc.10.4.427 doi: 10.1287/ijoc.10.4.427
|
| [43] |
Z. Gu, G. L. Nemhauser, M. W. P. Savelsbergh, Lifted Cover Inequalities for 0-1 Integer Programs: Complexity, INFORMS J. Comput., 11 (1999), 117–123. https://doi.org/10.1287/ijoc.11.1.117 doi: 10.1287/ijoc.11.1.117
|
| [44] |
M. Queyranne, Structure of a Simple Scheduling Polyhedron, Math. Program., 58 (1993), 263–285. https://doi.org/10.1007/BF01581271 doi: 10.1007/BF01581271
|
| [45] |
M. Queyranne, Y. Wang, Single-Machine Scheduling Polyhedra with Precedence Constraints, Math. Oper. Res., 16 (1991), 1–20. https://doi.org/10.1287/moor.16.1.1 doi: 10.1287/moor.16.1.1
|
| [46] |
P. Baptiste, C. Le Pape, W. P. M. Nuijten, Satisfiability Tests and Time-Bound Adjustments for Cumulative Scheduling Problems, Ann. Oper. Res., 92 (1999), 305–333. https://doi.org/10.1023/A:1018995000688 doi: 10.1023/A:1018995000688
|
| [47] |
J. N. Hooker, G. Ottosson, Logic-Based Benders Decomposition, Math. Program., 96 (2003), 33–60. https://doi.org/10.1007/s10107-003-0375-9 doi: 10.1007/s10107-003-0375-9
|
| [48] |
V. Deshpande, A. V. Iyer, R. Cho, Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies, Oper. Res., 54 (2006), 1028–1040. https://doi.org/10.1287/opre.1060.0327 doi: 10.1287/opre.1060.0327
|
| [49] |
J. C. García-Benito, M. Martín-Peña, A Redistribution Model with Minimum Backorders of Spare Parts: A Proposal for the Defence Sector, Eur. J. Oper. Res., 291 (2021), 178–193. https://doi.org/10.1016/j.ejor.2020.09.014 doi: 10.1016/j.ejor.2020.09.014
|
HMLV benchmark and readiness-network structure. Panels report (a) technical capability density, (b) mean alternative machines per operation, (c) readiness-budget ratio, and (d) cross-family setup burden across the structural benchmark subset
Stochastic HMLV order environment and demand heterogeneity. Panels show (a) realized portfolio size, (b) total offered value, (c) optimistic route-lower-bound workload pressure, and (d) workload–value coupling for independent-intermittent and correlated-lumpy scenarios
Policy value, information value, and exact-search evidence on the selected correlated-lumpy instance. (a) OOS value distributions for the three unique readiness-decision classes on the common 200-scenario bank. (b) Ranked paired gain of the stochastic readiness decision over the deterministic-medoid decision; the inset reports the deterministic-design gain and EVPI, and the lower annotation summarizes the exact LBBD ablation
Cross-instance comparisons of feasible-heuristic policy performance on 48 prespecified synthetic HMLV instances. (a) Sorted paired OOS net-objective differences between schedule-aware and aggregate-capacity policies (30 positive, 15 tied, and three negative instances); the extreme +287.24 difference lies beyond the displayed horizontal-axis range and is indicated by an arrow. (b) Mean paired differences and 95% confidence intervals against five reference policies. All first-stage choices are taken from a common finite candidate pool and OOS values are evaluated by a common feasible scheduling heuristic; neither panel demonstrates exact first-stage or exact 48-instance recourse optimality
Matched-scenario evaluation of fixed first-stage readiness networks on three small instances. (a) Schedule-aware-minus-aggregate net-objective differences computed with the common feasible scheduler and with exact mixed-integer recourse, using the same eight hash-selected OOS scenarios within each instance. (b) Arithmetic decomposition of the ranking reversal in instance $\texttt{S_FL_RL_SL_COR_R08}$: The original 100-OOS heuristic difference (+30.31), the eight-scenario sampling contrast (+13.15), and the exact-versus-heuristic evaluator contrast ($ -52.75 $) yield an eight-scenario exact difference of $ -9.29 $. These are limited fixed-readiness recourse checks, not exact evaluation of all 100 OOS scenarios or global reoptimization of the first-stage SAA problem