Research article

Sparse LP rounding with resource-exchange descent for multi-item continuous-review inventory under dual shared-resource constraints

  • Published: 09 November 2026
  • 90B05, 90C10, 90C27, 90C59

  • Multi-item continuous-review inventory optimization couples integer replenishment policies, item-level service requirements, and shared average-resource limits. Sparse linear programming rounding with resource-exchange descent (LP-SERD) was developed for a finite single-objective planning model with full backordering. Mean inventory and one-time shortage costs were evaluated under an explicit uniform-inventory-position approximation. Service-feasible item policies were enumerated and dominance-pruned to form an exact multiple-choice master for that model. The standard LP rank bound limits fractionality to the independent active resource rows. Common within-item resource ordering guarantees a feasible positive-support corner and an additive support-span cost bound. Two independent descent paths refine this start using single-item moves and directional two-item exchanges. Across 15 instances with 500–2000 items, the pooled median LP-certified gap was 0.000701%, and the maximum was 0.004148%. On 35 instances, LP-SERD had 28 lower-cost, 4 tied, and 3 higher-cost endpoints than repaired maximum-weight rounding followed by single-item descent. At a 60 s solver limit, full MILP obtained lower costs on 14 of 15 instances and closed 3 optimality proofs. A paired correlation experiment did not establish a monotone association between resource-coefficient correlation and exchange gain. All 10 OIL main models had integral LP optima; MAN exposed both small optimization gaps and holdout-service shortfalls. The evidence supports a feasible construction with a finite-model certificate, not a general replacement for tractable exact optimization.

    Citation: Qingbo Lu, Shuangcheng Huang, Mengzhen Huang, Daojun Li. Sparse LP rounding with resource-exchange descent for multi-item continuous-review inventory under dual shared-resource constraints[J]. Journal of Industrial and Management Optimization, 2026, 22(12): 6248-6270. doi: 10.3934/jimo.2026210

    Related Papers:

  • Multi-item continuous-review inventory optimization couples integer replenishment policies, item-level service requirements, and shared average-resource limits. Sparse linear programming rounding with resource-exchange descent (LP-SERD) was developed for a finite single-objective planning model with full backordering. Mean inventory and one-time shortage costs were evaluated under an explicit uniform-inventory-position approximation. Service-feasible item policies were enumerated and dominance-pruned to form an exact multiple-choice master for that model. The standard LP rank bound limits fractionality to the independent active resource rows. Common within-item resource ordering guarantees a feasible positive-support corner and an additive support-span cost bound. Two independent descent paths refine this start using single-item moves and directional two-item exchanges. Across 15 instances with 500–2000 items, the pooled median LP-certified gap was 0.000701%, and the maximum was 0.004148%. On 35 instances, LP-SERD had 28 lower-cost, 4 tied, and 3 higher-cost endpoints than repaired maximum-weight rounding followed by single-item descent. At a 60 s solver limit, full MILP obtained lower costs on 14 of 15 instances and closed 3 optimality proofs. A paired correlation experiment did not establish a monotone association between resource-coefficient correlation and exchange gain. All 10 OIL main models had integral LP optima; MAN exposed both small optimization gaps and holdout-service shortfalls. The evidence supports a feasible construction with a finite-model certificate, not a general replacement for tractable exact optimization.



    加载中


    [1]

    B. Ghalebsaz-Jeddi, B. C. Shultes, R. Haji, A multi-product continuous review inventory system with stochastic demand, backorders, and a budget constraint, Eur. J. Oper. Res., 158 (2004), 456–469. https://doi.org/10.1016/S0377-2217(03)00363-1

    doi: 10.1016/S0377-2217(03)00363-1
    [2]

    K. Das, T. K. Roy, M. Maiti, Multi-item stochastic and fuzzy-stochastic inventory models under two restrictions, Comput. Oper. Res., 31 (2004), 1793–1806. https://doi.org/10.1016/S0305-0548(03)00120-5

    doi: 10.1016/S0305-0548(03)00120-5
    [3]

    S. Y. Chou, P. C. Julian, K. C. Hung, A note on fuzzy inventory model with storage space and budget constraints, Appl. Math. Model., 33 (2009), 4069–4077. https://doi.org/10.1016/j.apm.2009.02.001

    doi: 10.1016/j.apm.2009.02.001
    [4]

    X. Zhao, M. Qiu, J. Xie, Q. He, Computing (r, Q) policy for an inventory system with limited sharable resource, Comput. Oper. Res., 39 (2012), 2368–2379. https://doi.org/10.1016/j.cor.2011.12.012

    doi: 10.1016/j.cor.2011.12.012
    [5]

    Y. Kou, Z. Wan, A new data-driven robust optimization approach to multi-item newsboy problems, J. Ind. Manag. Optim., 19 (2023), 197–223. https://doi.org/10.3934/jimo.2021180

    doi: 10.3934/jimo.2021180
    [6]

    A. Darendeliler, D. Claeys, E. H. Aghezzaf, Integrated condition-based maintenance and multi-item lot-sizing with stochastic demand, J. Ind. Manag. Optim., 19 (2023), 6908–6947. https://doi.org/10.3934/jimo.2022245

    doi: 10.3934/jimo.2022245
    [7]

    I. Saracoglu, S. Topaloglu, T. Keskinturk, A genetic algorithm approach for multi-product multi-period continuous review inventory models, Expert Syst. Appl., 41 (2014), 8189–8202. https://doi.org/10.1016/j.eswa.2014.07.003

    doi: 10.1016/j.eswa.2014.07.003
    [8]

    A. Azimian, B. Aouni, Multi-item order quantity optimization through stochastic goal programing, Ann. Oper. Res., 346 (2025), 751–779. https://doi.org/10.1007/s10479-024-05903-y

    doi: 10.1007/s10479-024-05903-y
    [9]

    S. Bhalla, E. Alfnes, H. H. Hvolby, F. Sgarbossa, Advances in spare parts classification and forecasting for inventory control: A literature review, IFAC-PapersOnLine, 54 (2021), 982–987. https://doi.org/10.1016/j.ifacol.2021.08.118

    doi: 10.1016/j.ifacol.2021.08.118
    [10]

    C. B. Haubitz, U. W. Thonemann, How to change a running system—controlling the transition to optimized spare parts inventory policies, Prod. Oper. Manag., 30 (2021), 1386–1405. https://doi.org/10.1111/poms.13327

    doi: 10.1111/poms.13327
    [11]

    L. M. Johannsmann, E. M. Craparo, T. L. Dieken, A. R. Fügenschuh, B. O. Seitner, Stochastic mixed-integer programming for a spare parts inventory management problem, Comput. Oper. Res., 138 (2022), 105568. https://doi.org/10.1016/j.cor.2021.105568

    doi: 10.1016/j.cor.2021.105568
    [12]

    V. F. Yu, N. Y. Salsabila, N. Siswanto, P. H. Kuo, A two-stage genetic algorithm for joint coordination of spare parts inventory and planned maintenance under uncertain failures, Appl. Soft Comput., 130 (2022), 109705. https://doi.org/10.1016/j.asoc.2022.109705

    doi: 10.1016/j.asoc.2022.109705
    [13]

    L. Zhang, Q. Deng, B. Miao, X. Liu, H. Shao, Parallel service mode of production and inventory for spare part inventory optimization, Knowl. Based Syst., 241 (2022), 108282. https://doi.org/10.1016/j.knosys.2022.108282

    doi: 10.1016/j.knosys.2022.108282
    [14]

    P. Sinha, A. A. Zoltners, The multiple-choice knapsack problem, Oper. Res., 27 (1979), 503–515. https://doi.org/10.1287/opre.27.3.503

    doi: 10.1287/opre.27.3.503
    [15]

    Y. Chen, J. K. Hao, A reduce and solve approach for the multiple-choice multidimensional knapsack problem, Eur. J. Oper. Res., 239 (2014), 313–322. https://doi.org/10.1016/j.ejor.2014.05.025

    doi: 10.1016/j.ejor.2014.05.025
    [16]

    L. Lamanna, R. Mansini, R. Zanotti, A two-phase kernel search variant for the multidimensional multiple-choice knapsack problem, Eur. J. Oper. Res., 297 (2022), 53–65. https://doi.org/10.1016/j.ejor.2021.05.007

    doi: 10.1016/j.ejor.2021.05.007
    [17]

    V. Cacchiani, M. Iori, A. Locatelli, S. Martello, Knapsack problems—an overview of recent advances. Part Ⅱ: Multiple, multidimensional, and quadratic knapsack problems, Comput. Oper. Res., 143 (2022), 105693. https://doi.org/10.1016/j.cor.2021.105693

    doi: 10.1016/j.cor.2021.105693
    [18]

    T. Szkaliczki, Solution methods for the multiple-choice knapsack problem and their applications, Mathematics, 13 (2025), 1097. https://doi.org/10.3390/math13071097

    doi: 10.3390/math13071097
    [19]

    M. S. Song, Y. Lu, D. Rando, F. J. Vasko, Statistical analyses of solution methods for the multiple-choice knapsack problem with setups: Implications for OR practitioners, Expert Syst. Appl., 262 (2025), 125622. https://doi.org/10.1016/j.eswa.2024.125622

    doi: 10.1016/j.eswa.2024.125622
    [20]

    I. Crévits, S. Hanafi, R. Mansi, C. Wilbaut, Iterative semi-continuous relaxation heuristics for the multiple-choice multidimensional knapsack problem, Comput. Oper. Res., 39 (2012), 32–41. https://doi.org/10.1016/j.cor.2010.12.016

    doi: 10.1016/j.cor.2010.12.016
    [21]

    J. Guo, M. Zhang, On lot sizing with capacity acquisition, J. Ind. Manag. Optim., 22 (2026), 3456–3479. https://doi.org/10.3934/jimo.2026126

    doi: 10.3934/jimo.2026126
    [22]

    M. Tang, F. Jing, X. Chao, A dynamic lot sizing model with production-or-outsourcing decision under minimum production quantities, J. Ind. Manag. Optim., 16 (2020), 2389–2406. https://doi.org/10.3934/jimo.2019059

    doi: 10.3934/jimo.2019059
    [23]

    T. W. Leung, C. K. Chan, M. D. Troutt, A mixed simulated annealing-genetic algorithm approach to the multi-buyer multi-item joint replenishment problem: advantages of meta-heuristics, J. Ind. Manag. Optim., 4 (2008), 53–66. https://doi.org/10.3934/jimo.2008.4.53

    doi: 10.3934/jimo.2008.4.53
    [24]

    F. Grandoni, R. Zenklusen, Approximation schemes for multi-budgeted independence systems, in Algorithms–ESA 2010, Springer, Berlin, 2010,536–548. https://doi.org/10.1007/978-3-642-15775-2_46

    [25]

    V. Beiranvand, W. Hare, Y. Lucet, Best practices for comparing optimization algorithms, Optim. Eng., 18 (2017), 815–848. https://doi.org/10.1007/s11081-017-9366-1

    doi: 10.1007/s11081-017-9366-1
    [26]

    P. Escalona, D. Araya, E. Simpson, M. Ramirez, R. Stegmaier, On the shortage control in a continuous review (Q, r) inventory policy using αL service-level, RAIRO Oper. Res., 55 (2021), 2785–2806. https://doi.org/10.1051/ro/2021125

    doi: 10.1051/ro/2021125
    [27]

    H. Zhang, A note on the convexity of service-level measures of the (r, q) system, Manage. Sci., 44 (1998), 431–432. https://doi.org/10.1287/mnsc.44.3.431

    doi: 10.1287/mnsc.44.3.431
    [28]

    E. Porras Musalem, R. Dekker, An inventory control system for spare parts at a refinery: An empirical comparison of different re-order point methods, Eur. J. Oper. Res., 184 (2008), 101–132. https://doi.org/10.1016/j.ejor.2006.11.008

    doi: 10.1016/j.ejor.2006.11.008
    [29]

    D. D. Haan, Benchmarking spare part demand forecasting methods, Erasmus University Rotterdam, 2021.

  • Reader Comments
  • © 2026 the Author(s), licensee AIMS Press. This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0)

Metrics

Article views(12) PDF downloads(0) Cited by(0)

Article outline

Figures and Tables

Figures(7)  /  Tables(3)

Other Articles By Authors

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return

Catalog