Research article

A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces

  • Published: 27 March 2026
  • 90B50

  • Existing resource scheduling methods for fully mechanized mining face installation fail to account for variations in resource demand during the installation process, resulting in resource shortages or redundancies that cause delays and disrupt normal production continuity. Here, we propose a digital twin-driven dynamic installation resource scheduling approach, integrating digital twin technology, neural network-based demand forecasting, and multi-objective optimization. A hierarchical digital twin system was constructed, comprising the twin model layer, data layer, and physical entity layer, which collaboratively facilitated real-time, adaptive scheduling of installation resources. The mechanism was elucidated through two phases: Pre-installation resource configuration and in-process dynamic scheduling, achieving closed-loop optimization of the installation resource management. Additionally, a real-time mapped twin model layer was developed to reflect the current state of the physical installation environment. The demand forecasting model employed an Adam-LSTM neural network to quantify installation resource requirements, generating demand predictions. The dynamic scheduling model utilized multi-objective optimization to balance physical constraints and operational goals, integrating demand forecasts to simulate the physical resource allocation process and derive optimal scheduling schemes. Application of this methodology to actual installation operations demonstrated that, compared to traditional approaches, the dynamic scheduling scheme reduced total costs by 75.66%, potential revenue loss by 73.35%, and inventory holding costs by 93.58%, offering a novel solution for rapid relocation of fully mechanized mining faces.

    Citation: Yunrui Wang, Xi He, Haoning Wang, Xintong Sui, Man Yu, Zhaoyang Zheng. A digital twin-driven installation resource dynamic scheduling method of fully mechanized mining faces[J]. Journal of Industrial and Management Optimization, 2026, 22(4): 2070-2091. doi: 10.3934/jimo.2026076

    Related Papers:

  • Existing resource scheduling methods for fully mechanized mining face installation fail to account for variations in resource demand during the installation process, resulting in resource shortages or redundancies that cause delays and disrupt normal production continuity. Here, we propose a digital twin-driven dynamic installation resource scheduling approach, integrating digital twin technology, neural network-based demand forecasting, and multi-objective optimization. A hierarchical digital twin system was constructed, comprising the twin model layer, data layer, and physical entity layer, which collaboratively facilitated real-time, adaptive scheduling of installation resources. The mechanism was elucidated through two phases: Pre-installation resource configuration and in-process dynamic scheduling, achieving closed-loop optimization of the installation resource management. Additionally, a real-time mapped twin model layer was developed to reflect the current state of the physical installation environment. The demand forecasting model employed an Adam-LSTM neural network to quantify installation resource requirements, generating demand predictions. The dynamic scheduling model utilized multi-objective optimization to balance physical constraints and operational goals, integrating demand forecasts to simulate the physical resource allocation process and derive optimal scheduling schemes. Application of this methodology to actual installation operations demonstrated that, compared to traditional approaches, the dynamic scheduling scheme reduced total costs by 75.66%, potential revenue loss by 73.35%, and inventory holding costs by 93.58%, offering a novel solution for rapid relocation of fully mechanized mining faces.



    加载中


    [1] J. J. Huo, J. H. Yang, B. Sun, Study on ventilation system management of multi-channel withdrawal process in fully mechanized mining auxiliary roadway, Coal Sci. Technol., 50 (2022), 142-146.
    [2] X. W, He, S. W. Wang, X. W. Zhang, Xi. Q. Ji, Key technologies and equipment for green short process of coal mine drainage resource utilization, J. China Coal Soc., 49 (2024), 958-966. http://doi.org/10.13225/j.cnki.jccs.YH23.1248 doi: 10.13225/j.cnki.jccs.YH23.1248
    [3] Y. Wang, J. Xiang, Y. Qin, S. B. Chen, Y. M. Zhu, M. L. Huang, et al., Characteristics and drainage modes of coalbed methane resources in closed coal mines in Yangquan and Jincheng Mining Areas, Coal Sci. Technol., 52 (2024), 165-179. http://doi.org/10.12438/cst.2023-1948 doi: 10.12438/cst.2023-1948
    [4] S. L, Yang, S. Zhang, X. D. Wang, K. Zhang, D. L. Xin, R. H. Zhai, Theoretical and technological concepts of synergistic coal and natural gas extraction. Coal Sci. Technol., 52 (2024), 50-68. http://doi.org/10.12438/cst.2023-1720 doi: 10.12438/cst.2023-1720
    [5] F. Jiang, Y. F. Liu, Z. C. Zhen, C. F. Zhang, G. B. Zhou, Y. X. Peng, A method for evaluating the accessibility of underground auxiliarytransportation vehicles in coal mines based on multi feature fusion, J. China Coal Soc., 49 (2024), 4986-5001. http://doi.org/10.13225/j.cnki.jccs.2023.1526 doi: 10.13225/j.cnki.jccs.2023.1526
    [6] X. T. Zhang, A. Guo, Y. F. Ai, B. Tian, L. Chen, Real-Time Scheduling of Autonomous Mining Trucks via Flow Allocation-Accelerated Tabu Search, IEEE Trans. Intell. Veh., 7 (2022), 466-479. http://doi.org/10.1109/tiv.2022.3166564 doi: 10.1109/tiv.2022.3166564
    [7] S. Wang, W. Yang, Y. X, Li, J. Q. Wu, W. Yang, A lightweight personnel detection method for underground coal mines, Coal Sci. Technol., 53 (2025). 383-392. http://doi.org/10.12438/cst.2023-1617 doi: 10.12438/cst.2023-1617
    [8] J. S. Bao, Q. L. Zhang, S. R. Ge, E. Y. Hu, X. M. Yuan, Y. Yang, et al., Basic research and application practice of unmanned auxiliary transportation system in coal mine, J. China Coal Soc., 48 (2023), 1085-1098. http://doi.org/10.13225/j.cnki.jccs.2022.1600 doi: 10.13225/j.cnki.jccs.2022.1600
    [9] F. J. He, L. W. Shen, Y. C. Song, J. Y. Niu, W. Y. Zhao, Optimal Scheduling Approach for Device and Human Resource Collaborative Tasks, J. Softw., 35 (2024), 5319-5340. http://doi.org/10.13328/j.cnki.jos.007037 doi: 10.13328/j.cnki.jos.007037
    [10] G. H. Fang, H. Y. Zhong, X. Wen, Z. C. Li, Y. N. Luo, Optimal operation of the Jiangsu Province section of the South-to-North Water Diversion Project under the operational mode of mutual transfer and diversion among lakes, Adv. Water Sci., 34 (2023), 776-787. http://doi.org/10.14042/j.cnki.32.1309.2023.05.012 doi: 10.14042/j.cnki.32.1309.2023.05.012
    [11] Y. Ji, B. J. Liu, J. H. Chen, Decentralized operational recourse scheduling based on e-commerce bidding structure, Syst. Eng. Electron., 46 (2024), 227-236.
    [12] H. Y. Wan, W. X. Liu, Q. X. Shi, J. Y. Liu, S. Zhang, A Post-Disaster Centralized Matching and Decentralized Dispatch Strategy for Emergency Resources in Urban Power Network, Trans. China Electrotech. Soc., 39 (2024), 7463-7480. http://doi.org/10.19595/j.cnki.1000-6753.tces.231836 doi: 10.19595/j.cnki.1000-6753.tces.231836
    [13] A. Y. Zhu, Q. F. Wang, C. W. Li, C. H. Wang, Research on the prediction of death number in coal mine accidents under the rapidincrease of coal production, J. China Coal Soc., 49 (2024), 340-347. http://doi.org/10.13225/j.cnki.jccs.2024.0084 doi: 10.13225/j.cnki.jccs.2024.0084
    [14] Q. C. Zhou, D. D. Wang, Z. W. Dang, C. Huo, J. Su, C. Y. Liu, et al., Research and comparative analysis of mine water inflow prediction method: a casestudy of Donggou Coal Mine in Xinjiang, Coal Sci. Technol., 52 (2024), 211-220. http://doi.org/10.12438/cst.2023-0907 doi: 10.12438/cst.2023-0907
    [15] S. H. Ren, X. M. Jiang, D. Z. Zheng, Y. N. Zhang, H. P. Xie, Z. Q. Guo, Demand and fluctuation range of China's coal production under the dual carbon target, Energy Rep., 11 (2024), 3267-3282. http://doi.org/10.1016/j.egyr.2024.03.005 doi: 10.1016/j.egyr.2024.03.005
    [16] X. Yang, J. B. Geng, X. Lan, S. B. Tang, Q. L. Chen, Multi-source approach research on prediction and mechanism of mountain surface subsidence caused by underground mining, Front. Earth Sci., 13 (2025), 1642350. http://doi.org/10.3389/feart.2025.1642350 doi: 10.3389/feart.2025.1642350
    [17] G. Q. Li, J. Hou, N. L. Hu, Integrated optimization model for production and equipment dispatching in underground mines, Chin. J. Eng., 40 (2018), 1050-1057. http://doi.org/10.13374/j.issn2095-9389.2018.09.005 doi: 10.13374/j.issn2095-9389.2018.09.005
    [18] L. C. Li, P. X. Wei, B. W. Du, Emergency resource dispatch method considering subway network vulnerability under sudden disasters, J. Railw. Sci. Eng., 22 (2025), 102-112.
    [19] X. Y. Huo, S. J. Yang, C. Z. Wu, J. Y. Dai, F. Yang, Particle swarm optimization for transportation dispatching system of open-pit mines, J. China Coal Soc., 37 (2012), 234-239. http://doi.org/10.13225/j.cnki.jccs.2012.s1.042 doi: 10.13225/j.cnki.jccs.2012.s1.042
    [20] H. Y. Xu, H. Z. Zhao, J. Y. Lu, H. Zuo, W. Zheng, P. Guo, et al., An integrated architecture for fixed truck assignment optimization in open-pit mines: Synergistic optimization, hybrid modeling, and multi-objective optimization, Appl. Energy, 404 (2026), 127170. http://doi.org/10.1016/j.apenergy.2025.127170 doi: 10.1016/j.apenergy.2025.127170
    [21] X. D. Hao, C. Z. Zhu, J. J. Zhang, S. R. Ge, K. Tian, C. Gao, Position and attitude digital twin model of hydraulic supports in fully mechanized workface, J. Mech. Sci. Technol., 38 (2024), 3741-3754. http://doi.org/10.1007/s12206-024-0645-4 doi: 10.1007/s12206-024-0645-4
    [22] Q. L. Zeng, X. L. Ban, Z. S. Meng, L. R. Wan, X. W. Lei, Digital twin reconstruction method of group spatial support pose for hydraulic support of working face based on Unity3D, Coal Sci. Technol., 52 (2024), 74-88. http://doi.org/10.12438/cst.2023-1819 doi: 10.12438/cst.2023-1819
    [23] W. J. Yang, D. Zhao, X. H. Zhang, X. Chen, X. L. Zheng, Y. H. Liu, et al., Research on digital twin-driven tracking, positioning and collision detection method of excavating and anchoring equipment, Coal Geol. Explor., 52 (2024), 160-173.
    [24] P. B. Gao, S. H. Zhao, Y. Zheng, Failure prediction of coal mine equipment braking system based on digital twin models, Processes, 12 (2024), 837. http://doi.org/10.3390/pr12040837 doi: 10.3390/pr12040837
    [25] Z. M. Kou, G. R. Wang, H. S. Deng, Z. X. Huang, X. X. Yan, Research on dynamic scheduling strategy of mine auxiliary transportation robotbased on digital twin, J. China Coal Soc., 51 (2026), 826-840. http://doi.org/10.13225/j.cnki.jccs.2025.0591 doi: 10.13225/j.cnki.jccs.2025.0591
    [26] Y. R. Wang, Y. Wang, J. H. Zhang, J. Li, Y. Wu, Research on the decision-making method of coal order price and coal purchase quantity based on prediction, Comput. Ind. Eng., 188 (2024), 109885. http://doi.org/10.1016/j.cie.2024.109885 doi: 10.1016/j.cie.2024.109885
  • Reader Comments
  • © 2026 the Author(s), licensee AIMS Press. This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0)
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Metrics

Article views(241) PDF downloads(12) Cited by(0)

Article outline

Figures and Tables

Figures(8)  /  Tables(13)

/