Citation: Jin H. Jo, Kadi Ilves, Tyler Barth, Ellen Leszczynski. Correction: Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA[J]. AIMS Energy, 2017, 5(2): 313-315. doi: 10.3934/energy.2017.2.313
In the original article [1], we did not notice the figures sequence in section 2 was not correct. It should start from figure 1 as follows:
The Kingsley Street parking lot (Lot G53) (Fig. 1.), roof of the Center for Performing Arts (CPA) (Fig. 2.), and the Center for Renewable Energy (CRE) (Fig. 3.) were selected.
The error was introduced during production. We apologize for any inconvenience caused to the readers by this change. This error does not change the scientific conclusions of the article in any way. The original manuscript will remain online on the article webpage.
All authors declare no conflicts of interest in this paper.
[1] |
Jo JH, Ilves K, Barth T, et al. (2017) Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA. AIMS Energy 5: 54-62. doi: 10.3934/energy.2017.1.54
![]() |
1. | R Thaib, S Rizal, T A Rizal, Comparison of predictive performance and measurement of off-grid 15 kWp solar power generation in Aceh Tamiang, 2019, 1402, 1742-6588, 044037, 10.1088/1742-6596/1402/4/044037 | |
2. | H Umar, M Amudy, T A Rizal, Feasibility study of installation photovoltaic system at a university in Indonesia: A case study, 2019, 1402, 1742-6588, 044035, 10.1088/1742-6596/1402/4/044035 |