Correction

Correction: Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA

  • A correction on
    Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA
    by Jin H. Jo, Kadi Ilves, Tyler Barth, Ellen Leszczynski. AIMS Energy, 2017, 5(1): 54-62. doi: 10.3934/energy.2017.1.54

    Citation: Jin H. Jo, Kadi Ilves, Tyler Barth, Ellen Leszczynski. Correction: Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA[J]. AIMS Energy, 2017, 5(2): 313-315. doi: 10.3934/energy.2017.2.313

    Related Papers:

    [1] Jin H. Jo, Kadi Ilves, Tyler Barth, Ellen Leszczynski . Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA. AIMS Energy, 2017, 5(1): 54-62. doi: 10.3934/energy.2017.1.54
    [2] Jin H. Jo, Jamie Cross, Zachary Rose, Evan Daebel, Andrew Verderber, David G. Loomis . Financing options and economic impact: distributed generation using solar photovoltaic systems in Normal, Illinois. AIMS Energy, 2016, 4(3): 504-516. doi: 10.3934/energy.2016.3.504
    [3] Chris Thankan, August Winters, Jin Ho Jo, Matt Aldeman . Feasibility of applying Illinois Solar for All (ILSFA) to the Bloomington Normal Water Reclamation District. AIMS Energy, 2021, 9(1): 117-137. doi: 10.3934/energy.2021007
    [4] Rashmi Murali, Sangeeta Malhotra, Debajit Palit, Krishnapada Sasmal . Socio-technical assessment of solar photovoltaic systems implemented for rural electrification in selected villages of Sundarbans region of India. AIMS Energy, 2015, 3(4): 612-634. doi: 10.3934/energy.2015.4.612
    [5] Jin H. Jo, Zachary Rose, Jamie Cross, Evan Daebel, Andrew Verderber, John C. Kostelnick . Application of Airborne LiDAR Data and Geographic Information Systems (GIS) to Develop a Distributed Generation System for the Town of Normal, IL. AIMS Energy, 2015, 3(2): 173-183. doi: 10.3934/energy.2015.2.173
    [6] A. A. Solomon . Large scale photovoltaics and the future energy system requirement. AIMS Energy, 2019, 7(5): 600-618. doi: 10.3934/energy.2019.5.600
    [7] Mesude Bayrakci Boz, Kirby Calvert, Jeffrey R. S. Brownson . An automated model for rooftop PV systems assessment in ArcGIS using LIDAR. AIMS Energy, 2015, 3(3): 401-420. doi: 10.3934/energy.2015.3.401
    [8] Taihana Paula, Maria de Fatima Marques . Recent advances in polymer structures for organic solar cells: A review. AIMS Energy, 2022, 10(1): 149-176. doi: 10.3934/energy.2022009
    [9] Nadejda Komendantova, Markus Manuel Schwarz, Wolfgang Amann . Economic and regulatory feasibility of solar PV in the Austrian multi-apartment housing sector. AIMS Energy, 2018, 6(5): 810-831. doi: 10.3934/energy.2018.5.810
    [10] Austin Bushur, Kevin Ward, Tommy Flahaven, Tom Kelly, Jin H. Jo, Matt Aldeman . Techno-economic evaluation of installing EV and PV combined infrastructure on Academic Institution’s Parking Garages in Illinois, USA. AIMS Energy, 2019, 7(1): 31-45. doi: 10.3934/energy.2019.1.31
  • A correction on
    Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA
    by Jin H. Jo, Kadi Ilves, Tyler Barth, Ellen Leszczynski. AIMS Energy, 2017, 5(1): 54-62. doi: 10.3934/energy.2017.1.54


    A correction on

    In the original article [1], we did not notice the figures sequence in section 2 was not correct. It should start from figure 1 as follows:

    Figure 1. 3D rendering of Kingsley (G53) parking lot PV canopy system.

    The Kingsley Street parking lot (Lot G53) (Fig. 1.), roof of the Center for Performing Arts (CPA) (Fig. 2.), and the Center for Renewable Energy (CRE) (Fig. 3.) were selected.

    Figure 2. 3D rendering of Center for Performing Arts rooftop PV system.
    Figure 3. 3D rendering of Center for Renewable Energy ground mounted PV system (phase one system size outlined in red color).

    The error was introduced during production. We apologize for any inconvenience caused to the readers by this change. This error does not change the scientific conclusions of the article in any way. The original manuscript will remain online on the article webpage.


    Conflict of Interest

    All authors declare no conflicts of interest in this paper.


    [1] Jo JH, Ilves K, Barth T, et al. (2017) Implementation of a large-scale solar photovoltaic system at a higher education institution in Illinois, USA. AIMS Energy 5: 54-62. doi: 10.3934/energy.2017.1.54
  • This article has been cited by:

    1. R Thaib, S Rizal, T A Rizal, Comparison of predictive performance and measurement of off-grid 15 kWp solar power generation in Aceh Tamiang, 2019, 1402, 1742-6588, 044037, 10.1088/1742-6596/1402/4/044037
    2. H Umar, M Amudy, T A Rizal, Feasibility study of installation photovoltaic system at a university in Indonesia: A case study, 2019, 1402, 1742-6588, 044035, 10.1088/1742-6596/1402/4/044035
  • Reader Comments
  • © 2017 the Author(s), licensee AIMS Press. This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0)
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Metrics

Article views(4647) PDF downloads(966) Cited by(2)

Article outline

Figures and Tables

Figures(3)

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return

Catalog